View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Amendment/ Corrigendum in TDS and PCC |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Completion Date(Lot No : ADP/Ranga/D-07) | 25/06/2029 | 30/11/2027 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Document last selling date & time | 25/03/2026 12:00 | 07/04/2026 12:00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Eligibility of Consultant | 1. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instructions for Tenderer: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work. 2. Only the certificates issuing from concern PE with detail information (such as; Name of the work, executed value, duration of work, official memo no. with date) will be accepted for specific experience. 3. All non-life insurance for any Public Property, or risks or liabilities pertaining to Public Property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019. 6. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of the Executive Engineer. 7. The clear instruction for all tenderer that "Payment will be made after availability of fund and approval of budget." |
1. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instructions for Tenderer: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work. 2. Only the certificates issuing from concern PE with detail information (such as; Name of the work, executed value, duration of work, official memo no. with date) will be accepted for specific experience.
3. All non-life insurance for any Public Property, or risks or liabilities pertaining to Public Property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019. 6. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of the Executive Engineer. 7. The clear instruction for all tenderer that "Payment will be made after availability of fund and approval of budget." |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opening Date & Time | 25/03/2026 14:00 | 07/04/2026 14:00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 1. Definitions(aa)Intended Completion Date | The Intended Completion Date for the whole of the Works shall be 2029-06-25 | The Intended Completion Date for the whole of the Works shall be 2027-11-30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Last date & time for Tender/Proposal Security Submission | 25/03/2026 13:00 | 07/04/2026 13:00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Closing Date & Time | 25/03/2026 14:00 | 07/04/2026 14:00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 1800.00 Lakh over the last 5 (Five) years.
|
The required average annual construction turnover shall be greater than Tk 1800.00 Lakh over the last 5 (Five) Fiscal years.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
NB: For each personnel varfiable Educational Certificates and Experienced Certificates have to submit. Otherwise will be treated as Non-responsive. |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
NB: For Key personnel varfiable Educational Certificates and Experienced Certificates have to submit. Otherwise will be treated as Non-responsive. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
NB: 1) For Owned Equipments: Ownership documents have to submit. Otherwise will be treated as Non-responsive. 2) For Leased Equipments: Ownership documents of the Owner and Deed agreement between Owner and Leasee have to submit. Otherwise will be treated as Non-responsive. |
Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
NB: 1) For Owned Equipments: Ownership documents have to submit. Otherwise will be treated as Non-responsive. 2) For Leased/Hired Equipments: Ownership documents of the Owner and Deed agreement between Owner and Leasee have to submit. Otherwise will be treated as Non-responsive. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Maximum number of partners in the JV shall be [insert number or insert “not limited”]
The minimum qualification requirements of Leading Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
[it is suggested that the Procuring Entity adheres to the above proportion of minimum qualifying requirements to meet the specific procurement needs. Percent share of business of the JV partners shall not be considered in determining the qualifications of a JV] |
Maximum number of partners in the JV shall be not limited
The minimum qualification requirements of Leading Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
[it is suggested that the Procuring Entity adheres to the above proportion of minimum qualifying requirements to meet the specific procurement needs. Percent share of business of the JV partners shall not be considered in determining the qualifications of a JV] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | Dredging Work of Kachalong River from Km. 60+650 to Km. 63+150 = 2.500 Km under Rangamati WD Division, BWDB, Kaptai.(ADP/Ranga/D-07) |
Dredging Work of Kachalong River from Km. 60+650 to Km. 63+150 = 2.500 Km under Rangamati WD Division, BWDB, Kaptai.(ADP/Ranga/D-07) |