As per TDS.
Construction of Level Crossing Gate (using BG PSC Special Sleepers), Ghumty and Gate Lodge (with boundary wall and walkways) & EPZ connecting road for Level Crossing Gate No. EPZ-2 at Km. 36/0-2 between Noapara-Singia Station, including Permanent diversion road leading from the existing LGED Road (for LC Gate no. E/54) to EPZ Connecting road-02, electrification and other ancillary works as per approved drawings in connection with Jashore EPZ under the jurisdiction of Divisional Engineer-1, Paksey.