a) Tenderer must be registered in the e-GP portal through CPTU along with valid and updated Trade License, Vat Registration andTIN certificate. b) Detail Turnover Calculation sheet mentioning the Name of Work, PE name etc (Year wise) duly signed by the Tenderer must besubmitted with the tender. c) It is duty of contractor to submit all the documents freshly (without corrupted). If any documents get corrupted and evaluationcommittee could not able to open the file, no claim from the tenderer will be entertained regarding the file. d) VAT & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard. e) Evaluation will be done following the latest Gazette/Circular from CPTU and PPR-2025. f) A detailed list of work in hand /ongoing works duly signed by the tenderer must be submitted. g) If any kind of obstacles/structures are needed to dismantle to execute the work as per design and specification the tenderer willdo this at his/her own arrangement and cost. No extra claim will be entertained in this regard. h) If BWDB-owned/acquired land is insufficient to execute the work as per design and specification, the tenderer will do this athis/her own arrangement and cost. i) Payment will be made upon the availability of fund. For this, no claim will be entertained. j) All other criteria stated in the tender document.
Survey work at different rivers, khals and embankments at Narail district for preparation of design data and estimates under O&M budget during the year 2025-26.