As Per TDS
LGCRRP/Kushtia/2025-26/W-12 Construction of RCC Drain at Chourhash Freedom Fighter Asadur Rahman Road Start from DC Court Boundary wall to M.A Rahim road existing Drain,Ch.0+00-0+480m at Ward No. 05,Under Kushtia Pourashava.