View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | BANBEIS Head Office shall receive 300 Mbps dedicated, uncontended, full duplex fiber internet connectivity and each UITRCE Office shall receive 30 Mbps dedicated fiber connectivity. Tenderer must have minimum 20 Gbps upstream/backbone capacity. One dedicated technician shall be deployed at BANBEIS Head Office during office hours throughout the contract period. Technician must have Diploma in Engineering (Computer/ICT/CMT or relevant), minimum 3 years’ experience, and skills in network setup, troubleshooting, CRM/LMS monitoring, OS, hardware/software maintenance and IT support. Tenderer must have minimum 10 permanent technical employees with proof. Redundancy must include alternate fiber path, backup last mile and auto failover. Security must include DDoS protection, hardware/software security and traffic filtering. MAL/OEM authorization not required. Annexure-A office list is part of tender. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 04/05/2026 12:00 | 10/05/2026 12:00 |
| Eligibility of Consultant | The applicant must possess a valid Trade License for FY 2025–2026. |
must possess a valid Trade License for FY 2025–2026. shall have minimum upstream/backbone internet capacity of 20 Gbps. must have minimum 10 permanent technical employees with proof Redundancy must include alternate fiber path, backup last mile and auto failover. Security must include DDoS protection, hardware/software security and traffic filtering. |
| Opening Date & Time | 04/05/2026 15:00 | 10/05/2026 15:00 |
| Last date & time for Tender/Proposal Security Submission | 04/05/2026 14:00 | 10/05/2026 14:00 |
| Closing Date & Time | 04/05/2026 15:00 | 10/05/2026 15:00 |
| Brief Description of Goods,Works or Service | Scope of Work, SLA & Requirements The ISP shall provide Full Duplex Dedicated Internet Bandwidth: 300 Mbps for BANBEIS Head Office (Dhaka) and 30 Mbps for each of 125 UITRCE locations. The ISP shall be responsible for all civil and installation works including excavation, trenching, ducting, fiber laying, installation, configuration, and testing as per industry standards. All required equipment (ODF, joint enclosures, media converters, fiber cables, etc.) must be supplied, installed, and properly managed with tagging, no exposed cables, and route protection. Basic training must be provided for troubleshooting and minor maintenance. Installation and commissioning must be completed within 15 days. A site survey report (layout, resource plan, timeline) is required. Qualified personnel must perform all à¦?াà¦?. Minimum SLA: 99.9% uptime, ≤0.1% packet loss; TTR: 4 hours (metro), 24 hours (Upazila). ISP must ensure proactive monitoring, DDoS protection, redundancy, and provide dashboard, reports, and MRTG access. A 24/7 NOC shall act as SPOC. The ISP must have nationwide coverage, last-mile capability, and district-level support. Contract duration: 1 year; BANBEIS may terminate with 1-month notice. ISP must continue service until replacement. Bandwidth upgrades allowed with 1-week notice (cost based on MRC). Service must be dedicated, non-shared fiber, supporting voice, data, and video with proper installation standards. |
The ISP shall provide Full Duplex Dedicated Internet Bandwidth: 300 Mbps for BANBEIS Head Office (Dhaka) and 30 Mbps for each of 125 UITRCE locations. The ISP shall be responsible for all civil and installation works including excavation, trenching, ducting, fiber laying, installation, configuration, and testing as per industry standards. All required equipment (ODF, joint enclosures, media converters, fiber cables, etc.) must be supplied, installed, and properly managed with tagging, no exposed cables, and route protection. Basic training must be provided for troubleshooting and minor maintenance. Installation and commissioning must be completed within 15 days. A site survey report (layout, resource plan, timeline) is required. Qualified personnel must perform all à¦?াà¦?. Minimum SLA: 99.9% uptime, ≤0.1% packet loss; TTR: 4 hours (metro), 24 hours (Upazila). ISP must ensure proactive monitoring, DDoS protection, redundancy, and provide dashboard, reports, and MRTG access. A 24/7 NOC shall act as SPOC. The ISP must have nationwide coverage, last-mile capability, and district-level support. Contract duration: 1 year; BANBEIS may terminate with 1-month notice. ISP must continue service until replacement. Bandwidth upgrades allowed with 1-week notice (cost based on MRC).
Service must be dedicated, non-shared fiber, supporting voice, data, and video with proper installation standards. Technician must have Diploma in Engineering (Computer/ICT/CMT or relevant), minimum 3 years’ experience, and skills in network setup, troubleshooting, CRM/LMS monitoring, OS, hardware/software maintenance and IT support. MAL/OEM authorization not required. |
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | updated corigendum.pdf | corigendum text | 1060876 | ||