View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Liquid Asset Missing |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 10/05/2026 16:00 | 17/05/2026 10:00 |
| Opening Date & Time | 11/05/2026 12:00 | 17/05/2026 12:00 |
| Last date & time for Tender/Proposal Security Submission | 11/05/2026 11:00 | 17/05/2026 11:00 |
| Closing Date & Time | 11/05/2026 12:00 | 17/05/2026 12:00 |
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk [state amount]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after considering the financial requirements of existing commitments. The actual period will depend on the speed with which the Procuring Entity will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one-month contingency for preparing the cheque a Example:
Contract Value: Tk 4 Cr. Therefore, the minimum required liquid asset will be Tk 0.66 Cr., i.e. 2 months cash flow based on the above assumptions.] [for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
[The formula for setting the LA is as follows: |
The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 3,00,000.00
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after considering the financial requirements of existing commitments. The actual period will depend on the speed with which the Procuring Entity will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one-month contingency for preparing the cheque a Example:
Contract Value: Tk 4 Cr. Therefore, the minimum required liquid asset will be Tk 0.66 Cr., i.e. 2 months cash flow based on the above assumptions.] [for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
[The formula for setting the LA is as follows: |