View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Some change of the TDS |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eligibility of Consultant | As stated in TDS |
As stated in TDS |
||||||||||||||||||||||||||||||||||||
| PCC 13. Possession of the Site13.1 Possession of the Site |
|
|
||||||||||||||||||||||||||||||||||||
| PCC 41. Programme of Works41.2 Programme Update | The period between Programme updates is Bi-monthly | The period between Programme updates is 60 | ||||||||||||||||||||||||||||||||||||
| PCC 41. Programme of Works41.3 Withhold amount | The amount to be withheld for late submission of an updated Programme is 10000.000 | The amount to be withheld for late submission of an updated Programme is 25500 | ||||||||||||||||||||||||||||||||||||
| PCC 6. Documents Forming the Contract and Priority of Documentsk.Documents |
|
|
||||||||||||||||||||||||||||||||||||
| PCC 64. Payment Certificates64.4 ES obligations withheld Amount Percentage | The amount of payment withheld of forfeited amount due to failure in compliance with any obligations under ES Specifications or reporting arrangement shall be 50000.000 | The amount of payment withheld of forfeited amount due to failure in compliance with any obligations under ES Specifications or reporting arrangement shall be 5100.000 | ||||||||||||||||||||||||||||||||||||
| PCC 71. Liquidated Damages71.1 Liquidated Damages |
|
|
||||||||||||||||||||||||||||||||||||
| PCC 75. Provisional Sums75.2 Provisional Sums | The percentage for adjustment of Provisional Sums is 0.000% | The percentage for adjustment of Provisional Sums is 100% | ||||||||||||||||||||||||||||||||||||
| PCC 82. As-built Drawings and Manuals82.2 Withheld amount | The amount to be withheld for failing to produce 'as-built' drawings and/or operating and maintenance manuals by the date required is Tk 50000.000 | The amount to be withheld for failing to produce 'as-built' drawings and/or operating and maintenance manuals by the date required is Tk 0 | ||||||||||||||||||||||||||||||||||||
| PCC 9. Eligibility9.1 Contractor nationality |
|
|
||||||||||||||||||||||||||||||||||||
| PCC 9. Eligibility9.2 Origin Countries |
|
|
||||||||||||||||||||||||||||||||||||
| PCC 92. Payment upon Termination92.1 Percentage for the works not completed | The percentage to apply to the contract value of the works not completed, representing the PE's additional cost for completing the uncompleted Works, is 20.000 percent. | The percentage to apply to the contract value of the works not completed, representing the PE's additional cost for completing the uncompleted Works, is 15 percent. | ||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- | The source of public funds is Governement of Bangladesh (GOB) |
The source of public funds is: GoB & Development Partner |
||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector in single contract(s) of similar nature [Building Construction/ Maintenance works], complexity and methods/construction technology successfully completed within the last 5 [five] years with a value of at least Tk. 38.00 lac. [years counting backward from the date of publication of IFT in the newspaper]
NOTE: If a Tenderer submits a specific experience certificate which was completed by a JV: (i) for non-divisible works: To calculate the value of a specific experience [i.e., the financial portion of the specific experience], the Tenderer’s business share of the JV of the previous specific experience shall be considered. However, the physical portion of the specific experience shall be wholly assigned to the Tenderers irrespective of their business share. [For example, if a Tenderer named ‘A’ submits a specific experience certificate of a 100 m bridge construction work amounting to 10 crore BDT completed by a joint venture of ‘A’ & another Tenderer ‘B’ (A-B JV) and the business share of ‘A’&‘B’in ‘A-B JV’ is 51% and 49% respectively, the calculation of the specific experience will be: The financial portion of the specific experience: Tenderer ‘A’ = (10*0.51) crore BDT = 5.1 crore BDT The physical portion of the specific experience: Tenderer ‘A’ = 100 m bridge construction work (whole physical experience)] (ii) for divisible works: The specific experience shall be determined according to their assigned component(s)/activity(ies) described in the completion certificate. [For example, if a Tenderer named ‘A’ submits a specific experience certificate of a 100 m bridge construction work amounting to 10 crore BDT completed by a joint venture of ‘A’ & another Tenderer ‘B’ (A-B JV) and the completion certificate describes that the works is divided between A & B as follows: A completed the superstructure valued BDT 6 crore and B completed the substructure valued BDT 4 crore. The calculation of the specific experience will be: The financial portion of the specific experience: Tenderer ‘A’ = 6 crore BDT The physical portion of the specific experience: Tenderer ‘A’ = The superstructure of 100 m bridge construction work] |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector in single contract(s) of similar nature [Building Construction/ Maintenance works], complexity and methods/construction technology successfully completed within the last 5 [five] years with a value of at least Tk. 38.00 lac. [years counting backward from the date of publication of IFT in the newspaper]
NOTE: |
||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets i.e. working capital, or Unconditional Credit Line, or credit facilities or bank balance shall be Tk. 20 Lac
-Working capital: authenticated by Audit Report |
The minimum amount of liquid assets i.e. working capital, or Unconditional Credit Line, or credit facilities or bank balance shall be Tk. 20 Lac
-Working capital: authenticated by Audit Report |
||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 50.00 lac over the last 5 [five] years. [ years counting backward from the date of publication of IFT in the newspaper] NB.-1: Evidence of construction turnover shall be considered by yearly payment certificate clearly describing payment date against individual scheme / work name or package name. NB.-2: Payment received Certificates for construction works, issued by relevant Procuring Entity(ies) will be considered as construction turnover. If a Tenderer submits a payment certificate which was completed by a JV: To calculate the required average annual construction turnover, the Tenderer’s business share of the JV of the previous work experience shall be considered. [For example, if a Tenderer named ‘A’ submits a payment certificate amounting to 10 crore BDT completed by a joint venture of ‘A’ & another Tenderer ‘B’ (A-B JV) and the business share of ‘A’&‘B’in ‘A-B JV’ is 51% and 49% respectively, the calculation of the average annual construction turnover will be: Value of construction turnover: Tenderer‘A’ = (10*0.51) crore BDT = 5.1 crore BDT] |
The required average annual construction turnover under public sector shall be greater than Tk 50.00 lac over the last 5 [five] years. [ years counting backward from the date of publication of IFT in the newspaper] NB.-1: Evidence of construction turnover shall be considered by yearly payment certificate clearly describing payment date against individual scheme / work name or package name. NB.-2: Payment received Certificates for construction works, issued by relevant Procuring Entity(ies) will be considered as construction turnover. If a Tenderer submits a payment certificate which was completed by a JV: To calculate the required average annual construction turnover, the Tenderer’s business share of the JV of the previous work experience shall be considered. [For example, if a Tenderer named ‘A’ submits a payment certificate amounting to 10 crore BDT completed by a joint venture of ‘A’ & another Tenderer ‘B’ (A-B JV) and the business share of ‘A’&‘B’in ‘A-B JV’ is 51% and 49% respectively, the calculation of the average annual construction turnover will be: Value of construction turnover: Tenderer‘A’ = (10*0.51) crore BDT = 5.1 crore BDT] |
||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenders are not allowed to form Joint Ventures to participate in this tendering process. |
The value of non-judicial stamp for execution of the Joint Venture Agreement shall be Tk 300 only |
||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenders are not allowed to form Joint Ventures to participate in this tendering process. |
Maximum number of partners in the JV shall be 02 [Two] .
|
||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | Tenderer must submit with its Tender, the following additional documents:
The Form “Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanction Framework” is attached in Section-5 (Form e-PW3D-9) of the Tender Environmentel and social management plan (ESMP) Occupational health and Safety (OHS) plan Air, water and noise pollution prevention plan and resource efficiency measures Community Health and Safety (CHS) plan grievance redress mechanism for Contractor's Personnel to raise workplace concerns.
Valid Trade License, Authorization Letter, National ID, valid Tax Identification Number(TIN), VAT registration number |
Tenderer must submit with its Tender, the following additional documents: The Form “Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanction Framework” is attached in Section-5 (Form e-PW3D-9) of the Tender Document which to be created in Tenderer Qualification Form as addition to Mandatory Forms. Environmentel and social management plan (ESMP) Occupational health and Safety (OHS) plan Air, water and noise pollution prevention plan and resource efficiency measures Community Health and Safety (CHS) plan Grievance redress mechanism for Contractor's Personnel to raise workplace concerns.
Valid Trade License, Authorization Letter, National ID, valid Tax Identification Number(TIN), VAT registration number |
||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | If no front loading or unbalanced is found in the Tenderer’s price, the Procuring Entity shall deduct at the rate of [five (5) or ten (10) percent] from each interim payment certificate as Retention Money. If front loading or unbalanced is found in the Tenderer’s price, the Procuring Entity shall deduct at the rate of [ten (10) percent or more] from each interim payment certificate as Retention Money. |
The Procuring Entity shall deduct at the rate of five (5) percent from each interim payment certificate as Retention Money |
||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | EARN-LGED-INFRA-W-15 |
EARN-LGED-INFRA-W-15 |