View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | Some Text will be change in Notice |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant |
As Per TDS and Last Amendment of PPR-2008 and Last Circular of CPTU.
Tubewell Materials are supplied departmentally and Materials Cost will be deducted from bill. |
As Per TDS and Last Amendment of PPR-2008 and Last Circular of CPTU.
Tubewell Materials are supplied departmentally and Materials Cost will be deducted from bill. |
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Specific Experience would be Changed |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(Five) years. Years counting backward from the date of publication of IFT in the e-GP website. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01(One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05(Five) years, each with a value of at least Tk. 80,00,000.00(Eighty Lac). Years counting backward from the date of publication of IFT in the e-GP website. |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(Five) years. Years counting backward from the date of publication of IFT in the e-GP website. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01(One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05(Five) years, each with a value of at least Tk. 65,00,000.00(Sixty Five Lac). Years counting backward from the date of publication of IFT in the e-GP website. |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Some Text will be added in BoQ |