View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Liquid assets should be 45.00 lac. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 01. The minimum specific experience as a Prime Contractor or Sub Contractor or Management Contractor in construction works of at least Single contract of similar nature, complexity and methods/construction technology successfully completed within the last 20 (twenty) years of RCC Bridge/Culvert of an amount of minimum Tk. 75.00 (seventy five) Lac in a single contract. (Years counting backward from the date of publication of IFT in the e-GP System).
02. The required average annual construction turnover shall be greater than Tk. 145.00 (one corre fourty five lac) Lac over the last 5 (Five) years out of last 10 (Ten) fiscal years. [years counting backward from the date of publication of IFT in e-GP website]
03. Liquid asset should be tk. 90.00 lac (ninety lac) and should sustain in his account for last 3-month before the tender publishment date. In case of submitting credit facility it should be collected on a date after tender publishing date against the work with tender ID with the same amount.
04. The tenderer must be submitted Turn-Over, Tender Capacity and On-going work Calculation sheet (Both hard copy and Excel sheet soft copy as per attached format in section 8, Particular Specifications).
05. Tender submission, evaluation criteria etc. have been described in details in TDS.
ii) For the cost of salvaged goods taka should be deposited in the bank through challan and the bill should be submitted. |
01. The minimum specific experience as a Prime Contractor or Sub Contractor or Management Contractor in construction works of at least Single contract of similar nature, complexity and methods/construction technology successfully completed within the last 20 (twenty) years of RCC Bridge/Culvert of an amount of minimum Tk. 75.00 (seventy five) Lac in a single contract. (Years counting backward from the date of publication of IFT in the e-GP System).
02. The required average annual construction turnover shall be greater than Tk. 145.00 (one corre fourty five lac) Lac over the last 5 (Five) years out of last 10 (Ten) fiscal years. [years counting backward from the date of publication of IFT in e-GP website]
03. Liquid asset should be tk. 45.00 lac (ninety lac) and should sustain in his account for last 3-month before the tender publishment date. In case of submitting credit facility it should be collected on a date after tender publishing date against the work with tender ID with the same amount.
04. The tenderer must be submitted Turn-Over, Tender Capacity and On-going work Calculation sheet (Both hard copy and Excel sheet soft copy as per attached format in section 8, Particular Specifications).
05. Tender submission, evaluation criteria etc. have been described in details in TDS.
ii) For the cost of salvaged goods taka should be deposited in the bank through challan and the bill should be submitted. |
| Brief Description of Goods,Works or Service | 05/e-GP/PMP-Culvert/JRD/2025-2026 |
05/e-GP/PMP-Culvert/JRD/2025-2026 |