As per TDS
CIDP/Sadar/2025-26/Wid.W-01 Part-A: Improvement of Monagram - Bowarabazar Road at Ch: 00-3350m (Road ID: 419674008) (Salvage Cost Tk.10,889/-), (i) Earth Work (3081.816cum), (ii) Road Widening (3350m), (iii) Protective Work 262m, (iv) Structure Work (1.00mx1.00m Box Culvert at Ch. 212m) , (v) Road Safety Work (3350m), Part-B: Improvement of Kalir Bazar GC to Haripur Bazar RHD Road (Sadar part) Road at Ch: 00-1328m (Road ID: 419672009), (i) Earth Work (2557.102cum), (ii) Road Widening (1328m), (iii) Protective Work (368m), (iv) Road Safety Work (1328m) under Adarsha Sadar Upazila, District: Cumilla (2nd Call).