As per TDS
CIDP/Barura/2025-26/W-18 Part-A: Improvement of Hossainpur-Lakshmipur Road at Ch: 00-800m (Road ID: 419095139) , (i) Earth Work (244.11cum), (ii) Road Work (800m), (iii) Construction of 0.90x0.90m Cross Drain at Ch: 343m, 385m & 731m on the same road, (iv) Construction of 33m Protective Work on the same road, (v) Road Safety Work (800m) (Part-B) Improvement of Pilgiri - Adda Hospita Road at Ch: 00-2850m (Road ID: 419095211) (Salvage Cost: 2,30,768/-), (i) Earth Work (1057.65cum), (ii) Road Work (2850m), (iii) Construction of 1x4.00mx4.00m Box Culdert at Ch. 154m & Construction of 0.90x0.90m U-Drain at Ch: 914m, 1200m & 2617m & Construction of 1x3.00x3.00m Box Culvert at Ch. 1958m on the same road) (iv) Construction of 21m Protective Work on the same road, (v) Road Safety Work (2850m) under Barura Upazila, District: Cumilla.