| Brief Description of Works : |
Construction Of Steel Structure Buffer Godown For Urea Fertilizer at Borguna Site (10000MT)
Site Development & Construction of Steel Structure of Godown, Office cum Guest house, Ansar Barrack, Sub-Station & Generator room, External Toilet Block, Watch Tower, RCC Road, RCC Storm Drain, Pump House & U.G.W.R., Boundary Wall Main Gate & Guard room, Pond Works, Sub-Station Equipment (100KVA), Generator (60 KVA), Solar System Works (5 KW), External Electrification (Street Light) etc.
|