View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Time extension |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 02/08/2026 16:00 | 09/08/2026 16:00 |
| Opening Date & Time | 03/08/2026 12:00 | 10/08/2026 12:00 |
| Last date & time for Tender/Proposal Security Submission | 03/08/2026 11:30 | 10/08/2026 11:30 |
| Closing Date & Time | 03/08/2026 12:00 | 10/08/2026 12:00 |
| TDS/PDS--D. e-Tender Preparation-- |
The Tenderer shall submit with its Tender the following additional documents: 12. At least 01 (One) no. of Manufacturer’s Satisfactory Performance Certificates (supported by the supply record) from Electricity Utility as End User depicting that offered/higher ampere rating of same voltage class CT has been supplied within last 07 (Seven) years; years counting backward from the date of publication of IFT in the e-GP System and has been in satisfactorily service for at least 01 (One) Year. The Satisfactory Performance Certificate (SPC) shall be in End User’s official pad and shall contain end-user’s full mailing address, e-mail address, website address and fax / telephone number for the convenience of authentication. a. A manufacturer whose CT has been rejected by NESCO at any stage—whether during Pre-Delivery Inspection (PDI) or Post-Landing Inspection (PLI)—within the last 3 (three) years, shall be considered non-responsive for this tender b. Electricity Utility means an organization/company that engages in electricity generation/ transmission / distribution of electricity for sale in a regulated market. 13. Type Test Certificates & Reports: As per Section 6 specified in Tecnical Specification.
Note: If required, Purchaser will authenticate Type Test Certificates & Reports from the Certificates & Reports issuing laboratory. The certificates and Reports shall contain laboratory’s full mailing address, e-mail address, website address and fax/telephone number for the convenience of authentication. If these information are not mentioned in the Certificates & Reports, all these information should be mentioned in the Letter head pad of the manufacturer duly seal & signed by the manufacturer representative. The tenderer will bear all cost of test report authentication. |
The Tenderer shall submit with its Tender the following additional documents: 12. At least 01 (One) no. of Manufacturer’s Satisfactory Performance Certificates (supported by the supply record) from Electricity Utility as End User depicting that offered/higher ampere rating of same voltage class CT has been supplied within last 07 (Seven) years; years counting backward from the date of publication of IFT in the e-GP System and has been in satisfactorily service for at least 01 (One) Year. The Satisfactory Performance Certificate (SPC) shall be in End User’s official pad and shall contain end-user’s full mailing address, e-mail address, website address and fax / telephone number for the convenience of authentication. a. Electricity Utility means an organization/company that engages in electricity generation/ transmission / distribution of electricity for sale in a regulated market. 13. Type Test Certificates & Reports: As per Section 6 specified in Tecnical Specification. Country of manufacture and country of origin must be same. If the country of manufacture is differ from country of origin, the OEMs associated (Legally authorized and supported documents must be submitted) manufacturing plant (from where product will be manufactured & shipped) must have separate type test report from STL member organization laboratory.
Note: If required, Purchaser will authenticate Type Test Certificates & Reports from the Certificates & Reports issuing laboratory. The certificates and Reports shall contain laboratory’s full mailing address, e-mail address, website address and fax/telephone number for the convenience of authentication. If these information are not mentioned in the Certificates & Reports, all these information should be mentioned in the Letter head pad of the manufacturer duly seal & signed by the manufacturer representative. The tenderer will bear all cost of test report authentication. |