1) For ITT Clause 13.1(a) The Required General Experience Shall Be 05(Five) Years.2) For ITT Clause 13.1(b) the minimum Specific Experience Shall be at least One Similar work Order amounting to BDT 950.00( Nine Hundred Fifty) Lakh under a single contract within the last 05 (Five) years.3) For ITT Clause 14.1(b) the average Annual Construction Turnover shall be BDT 1200.00 (One Thousand two hundred) lakh per year during the last 05 (Five) years, totaling BDT 6000.00 lakh (1200 X 5 =6000.00 lakh).4) For ITT Clause 14.1(c) the Minimum Liquid Asset shall be fixed at BDT 200.00 (two hundred) lakh, and it must be submitted in accordance with the e-PW3-8 format.5) For ITT Clause 14.1(d), the Minimum Tender Capacity Shall be fixed at BDT 1000.00 (One Thousand) Lakh.6) According to For ITT Clause 23.1(h) , the Income Tax Assessment Year Shall be 2024-25 or 2023-24.7) According to For ITT Clause 31.1(i) , the Audit Report for the last 01 (One) year from the date of IFT must be uploaded.8) The Rates quoted by the tenderer shall remain fixed for the entire duration of the contract till the contracted work is completed through the contract period. Any price adjustment, escalation or additional claim shall never be entertained/allowed under any circumstances until the completion of the works.9) Payment of bills shall be made subject to the availability of funds. However the contractor shall complete all works within the stipulated time specified in the contract. 10) All Payments shall be made according to the rates quoted/submitted by the winner tenderer. Any claim, request or demand for additional payment due to price escalation, extension of time, market fluctuation or any other reason shall never be entertained for the interest of the government, as the budget for this work is fixed in the DPP, By participating in this tender, all the tenderers shall be deemed to have unconditionally accepted the above terms and conditions.
EED/KUS/15POLY/2025-26/WR-01/WD-29 Construction of 05-Storied Female Hostel Building with 05-Storied Foundation IN/C Sanitary, Water Supply & Electrification Works At Kushtia Polytechnic Institute, Sadar, Kushtia.