As per Tender Data Sheet and ITT Clause.
UDCGP-GCC-RB-1 Construction of Overpass near Joydebpur Railway Station.
The total length of the Overpass is 977m (approx.).
The works include- • Cast-in-situ bored piles by hydraulic rotary method • Prestressed Concrete Girders (span length varied from 29.6m to 37.10m). • Ramp with RCC Retaining Wall, Length=205.88m (width 8.5m) and length=83.76m (width 16.4m). • PC-Girders Bridge works include 3 (three) Sections; Section1 Length=372.49m (width 8.500m), Section2 length=380.87m (width 8.5m) and Section3 length=380.87m (width 16.4m). • Middle Span 71.1m (over railway) with Steel Arch Truss • Road works with bituminous pavement • Drainage & Rainwater Disposal System • Safety and Traffic management • Electrical works.