Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to modified Notice, TDS |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 11/10/2026 12:00 | 18/10/2026 12:00 |
| Eligibility of Consultant | All e-GP registered potential tenderers are eligible to submit a tender provided they could fulfill the qualification criteria specified in the Tender Document. |
All e-GP registered potential tenderers are eligible to submit a tender provided they could fulfill the qualification criteria specified in the Tender Document. |
| Opening Date & Time | 11/10/2026 13:00 | 18/10/2026 13:00 |
| Meeting End Date & Time | 11/10/2026 10:00 | 18/10/2026 10:00 |
| Last date & time for Tender/Proposal Security Submission | 11/10/2026 12:30 | 18/10/2026 12:30 |
| Closing Date & Time | 11/10/2026 13:00 | 18/10/2026 13:00 |
| TDS/PDS--C. Qualification Criteria-- |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (one) contract of the same nature, complexity, and methods/construction technology/ construction of Flexible pavement works (Widening/Strengthening) with DBS surfacing and Construction of Rigid Pavement work successfully completed within the last 20 (twenty) years, each with a value of at least Tk. 6,000.00 (Six Thousand) Lakh. Same nature, complexity, and methods/construction technology here refers only to Flexible pavement works (Widening/Strengthening) with DBS surfacing and Construction of Rigid Pavement work |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (one) contract of the same nature, complexity, and methods/construction technology/ construction of Flexible pavement works (Widening/Strengthening) with DBS surfacing and Construction of Rigid Pavement/Concrete Construction work successfully completed within the last 20 (twenty) years, each with a value of at least Tk. 6,000.00 (Six Thousand) Lakh. Same nature, complexity, and methods/construction technology here refers only to Flexible pavement works (Widening/Strengthening) with DBS surfacing and Construction of Rigid Pavement/Concrete Construction work |
| TDS/PDS--C. Qualification Criteria-- | The minimum capacity shall be: Tk. 7,000.00 (Seven Thousand) Lakh. The following formulae shall be used to calculate the Tender Capacity Assessed Tender Capacity = (A*N*1.25-B) A=Maximum value of Works performed in any one year during last five years N= Completion time of the proposed work in years B= Value of Existing commitments and works to be completed during the next N Years |
The minimum capacity shall be: Tk. 7,000.00 (Seven Thousand) Lakh. The following formulae shall be used to calculate the Tender Capacity Assessed Tender Capacity = (A*N*1.25-B) A=Maximum value of Works performed in any one year during last Ten years N= Completion time of the proposed work in years B= Value of Existing commitments and works to be completed during the next N Years |
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None |
The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None |
| Brief Description of Goods,Works or Service | Improvement of Sirajganj-Raiganj (Chandaikona) Zilla Highways (Z-5042) by Re-Construction, Widening and Strengthening, DBS Surfacing work and Construction of Rigid Pavement, 2 Nos R.C.C Box Culvert, Protective Work, Drainage Work at Ch. 0+000 to 10+750 km under Road Division Sirajganj during the year 2026-2027 (WP-01). |
Improvement of Sirajganj-Raiganj (Chandaikona) Zilla Highways (Z-5042) by Re-Construction, Widening and Strengthening, DBS Surfacing work and Construction of Rigid Pavement, 2 Nos R.C.C Box Culvert, Protective Work, Drainage Work at Ch. 0+000 to 10+750 km under Road Division Sirajganj during the year 2026-2027 (WP-01). |