Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | BoQ |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instructions for Tenderer: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work. 2. Only the certificates issuing from concern PE with detail information (such as; Name of the work, executed value, duration of work, official memo no. with date) will be accepted for specific experience. 3. All non-life insurance for any Public Property, or risks or liabilities pertaining to Public Property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019. 6. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of the Executive Engineer. 7. The cost of all tests (compressive strength, materials test etc.) should be carried by the Contractor himself. 8. The clear instruction for all tenderer that "Payment will be made after availability of fund and approval of budget." |
1. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instructions for Tenderer: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work. 2. Only the certificates issuing from concern PE with detail information (such as; Name of the work, executed value, duration of work, official memo no. with date) will be accepted for specific experience.
3. All non-life insurance for any Public Property, or risks or liabilities pertaining to Public Property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019. 6. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of the Executive Engineer. 7. The cost of all tests (compressive strength, materials test etc.) should be carried by the Contractor himself. 8. The clear instruction for all tenderer that "Payment will be made after availability of fund and approval of budget." |
| Brief Description of Goods,Works or Service | Bank Protective Work from Km. 0.000 to Km. 0.150 = 150m at Bazar Area and Km. 0.000 to Km. 0.200 = 200m at Shashan area; Total = 350m at Upazila: Naniarchar, Dist: Rangamati under Rangamati WD Division, BWDB, Kaptai. (ADP/Ranga/PW-11) |
Bank Protective Work from Km. 0.000 to Km. 0.150 = 150m at Bazar Area and Km. 0.000 to Km. 0.200 = 200m at Shashan area; Total = 350m at Upazila: Naniarchar, Dist: Rangamati under Rangamati WD Division, BWDB, Kaptai. (ADP/Ranga/PW-11) |