View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum issues are required cahnges in TDS & PCC. |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eligibility of Consultant | As stated in detail in ITT and TDS. |
As stated in detail in ITT and TDS. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| Location(Lot No : 1) | Ponchokoron,Morrelganj | Ponchokoron,Morrelganj,Bagerhat | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opening Date & Time | 14/10/2026 15:00 | 19/10/2026 16:30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 64. Payment Certificates64.5 ES obligations withheld maximum Amount Percentage | The maximum amount of payment withheld of forfeited due to failure in compliance with ES Specifications is 0.200 percent of the final Contract Price of the whole of the Works. | The maximum amount of payment withheld of forfeited due to failure in compliance with ES Specifications is 2 percent of the final Contract Price of the whole of the Works. | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| Last date & time for Tender/Proposal Security Submission | 14/10/2026 14:30 | 19/10/2026 16:00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| Start Date(Lot No : 1) | 01/11/2026 | 25/11/2026 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| Closing Date & Time | 14/10/2026 15:00 | 19/10/2026 16:30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- | A Pre-Tender meeting shall not be held. |
A Pre-Tender meeting shall be held through e-GP system. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- |
The following are authorised agents/offices of the Procuring Entity for the purpose of issuing the Tender Document: e-mail address:xen.bwdb.bagerhat@gmail.com
[If not applicable, please specify “None”. If there is more than one (1) Agent office, then list all Agent’s office names and contact details] |
The following are authorised agents/offices of the Procuring Entity for the purpose of issuing the Tender Document: e-mail address:xen.bwdb.bagerhat@gmail.com
[If not applicable, please specify “None”. If there is more than one (1) Agent office, then list all Agent’s office names and contact details] |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- | the Procuring Entity’s address is:The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat.
Telephone:0468-62195
[state date (within 2/3rds of time from the date of IFT)] |
For Clarification of Tender Document purposes only, The Procuring Entity’s address is:The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. Address: Office of the Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. Telephone:0468-62195
e-mail address: xen.bwdb.bagerhat@gmail.com |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | TThe minimum specific experience as a Prime Contractor or Subcontractor or ManagementContractor in construction works under public sector of at least onecontract(s) ofConstruction/Repair of revetment/river bank protection work/shore protectionwork/crossbar/Spur/groyne successfully completed within the last 5 years, each with a value of at least Tk. 52400000.00BDT (Five Crore Twenty-Four Lakh Taka Only)..)
|
TThe minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least one (01) contract of Construction/ Repair of revetment/ River bank protection work/ shore protection work/ crossbar/ Spur/ Groyne successfully completed within the last 5 years, each with a value of at least Tk. 5,20,00,000.00 (Five Crore Twenty Lakh Only). |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 20000000 .00 BDT(Taka TWO Crore only) |
The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 2,00,00,000 .00 (Two Crore only). |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum capacity shall be Tk. 52400000.00BDT (Five Crore Twenty-Four Lakh Taka Only).
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
The minimum capacity shall be Tk. 5,20,00,000.00 (Five Crore Twenty Lakh Only).
The following formulae shall be used to calculate the Tender Capacity |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover under public sector shall be greater than Tk. 104800000 BDT.(Ten Crore Forty-Eight Lakh Taka only) over the best three (3) years in the last five (5) financial years. |
The required average annual construction turnover under public sector shall be greater than Tk. 10,40,00,000.00 (Ten Crore Forty Lakh only) over the best three (3) years in the last five (5) financial years. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
[qualification of an alternative Construction Project Manager may also be requested] [for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | Alternatives will not be permitted. |
Alternatives will not be permitted. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | Alternative technical solutions for any parts of works will not be permitted. |
Alternative technical solutions for any parts of works will not be permitted. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The prices quoted by the Tenderers shall be fixed for the duration of the Contract.
[Price adjustment clauses are usually permitted for Contracts, execution of which will take more than eighteen (18) months from Start Date to Completion Date. The Procuring Entity must consider each Contract on its individual merit; approval of HOPE will be required for Contracts of less than eighteen (18) months . If prices shall be adjustable, the base value of the Indexes including sources and, its corresponding weightings or coefficients for adjustment should be specified in the Appendix to Tender: Table 1.1 and 1.2 and in the Contract] |
The prices quoted by the Tenderers shall be fixed for the duration of the Contract.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The required information regarding claims under litigation shall be current or during the last 5.00years. |
The required information regarding claims under litigation shall be current or during the last 03 (Three) years. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
The required audit reports on the financial standing, such as profit and loss statements and balance |
The required audit reports on the financial standing, such as profit and loss statements and balance sheet shall be for the past 02 (two) years. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The amount of the Tender Security shall be Tk. 1750000.00 BDT.(Seventeen Lakh Fifty Thousand Taka Only)
[for more than one lot in a package, the Tender Security for each lot may be determined on different percentage basis and , should be mentioned separately] |
The amount of the Tender Security shall be Tk. 17,00,000.00 (Seventeen Lakh Only). |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | TThe biographical data of the Adjudicator is:
The hourly fee shall be Tk 5000(Five Thousand
[provide relevant information, such as education, experience, age, nationality, and present position; attach additional pages as necessary] |
TThe biographical data of the Adjudicator is:
The hourly fee shall be Tk 5000(Five Thousand) only. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | SPN-01 |
SPN-01 |