View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum issues required. |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Document last selling date & time | 13/10/2026 16:50 | 18/10/2026 16:00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Eligibility of Consultant | As stated in detail in ITT and TDS. |
As stated in detail in ITT and TDS. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Location(Lot No : 1) | Debraj ,Morrelganj | Debraj ,Morrelganj,Bagerhat | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opening Date & Time | 14/10/2026 15:00 | 19/10/2026 16:00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 1. Definitions(aa)Intended Completion Date | The Intended Completion Date for the whole of the Works shall be 2027-06-30 | The Intended Completion Date for the whole of the Works shall be 2027-06-30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 1. Definitions1.1(qq)StartDate | The Start Date shall be 2026-11-15 | The Start Date shall be 2026-12-02 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 1. Definitions1.1(uu)Works |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 13. Possession of the Site13.1 Possession of the Site |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 2. Interpretation2.5. Sectional completion |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 39. Commencement of Works39.1 Commencement of Works | Commencement Date of Works: 2026-11-01 | Commencement Date of Works:2026-11-25 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 41. Programme of Works41.2 Programme Update | The period between Programme updates is 15 | The period between Programme updates is 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 41. Programme of Works41.3 Withhold amount | The amount to be withheld for late submission of an updated Programme is 2000.000 | The amount to be withheld for late submission of an updated Programme is 20000 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 64. Payment Certificates64.5 ES obligations withheld maximum Amount Percentage | The maximum amount of payment withheld of forfeited due to failure in compliance with ES Specifications is 0.000 percent of the final Contract Price of the whole of the Works. | The maximum amount of payment withheld of forfeited due to failure in compliance with ES Specifications is 2 percent of the final Contract Price of the whole of the Works. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 82. As-built Drawings and Manuals82.1 As-built drawing date |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 9. Eligibility9.1 Contractor nationality |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 9. Eligibility9.2 Origin Countries |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Last date & time for Tender/Proposal Security Submission | 14/10/2026 14:30 | 19/10/2026 15:30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Start Date(Lot No : 1) | 01/11/2026 | 25/11/2026 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Closing Date & Time | 14/10/2026 15:00 | 19/10/2026 16:00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- |
The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. The Name of the Tender is:River Bank protection work (Precautionary) from km 14.500 to km 14.800 = 300 m at Debraj of Doiboggohati Sub-Project along the Left Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of Panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " under Bagerhat WD Division, BWDB, Bagerhat. Tender Ref: 42.01.0100.617.000.44.0001.26-555;Date:20/09/2026 Lot No(s):DB-01 [if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities] |
The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. The Name of the Tender is:River Bank protection work (Precautionary) from km 14.500 to km 14.800 = 300 m at Debraj of Doiboggohati Sub-Project along the Left Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of Panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " under Bagerhat WD Division, BWDB, Bagerhat. Tender Ref: 42.01.0100.617.000.44.0001.26-555; Date:20/09/2026 Lot No(s):DB-01 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- |
The following are authorised agents/offices of the Procuring Entity for the purpose of issuing the Tender Document: e-mail address:
Office address of Agent(s) Address: Telephone No.: e-mail address:
[If not applicable, please specify “None”. If there is more than one (1) Agent office, then list all Agent’s office names and contact details] |
The following are authorised agents/offices of the Procuring Entity for the purpose of issuing the Tender Document: |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- |
For clarification of Tender Document purposes only, the Procuring Entity’s address is:The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. |
For clarification of Tender Document purposes only, the Procuring Entity’s address is: Office of the Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum specific experience as a Prime Contractor or Subcontractor or ManagementContractor in construction works under public sector of at least onecontract(s) ofConstruction/Repair of revetment/river bank protection work/shore protectionwork/crossbar/Spur/groyne successfully completed within the last 5 years, each with a value of at least Tk. 55600000.00 BDT (Five Crore Fifty-Six Lakh Taka Only)); years counting backward from the date of publication of IFT in the newspaper]
|
The minimum specific experience as a Prime Contractor or Subcontractor or ManagementContractor in construction works under public sector of at least onecontract(s) of Construction/ Repair of revetment/ River bank protection work/ Shore protection work/ Crossbar/ Spur/ Groyne successfully completed within the last 5 years, each with a value of at least Tk. 5,50,00,000.00 (Five Crore Fifty Lakh Only); years counting backward from the date of publication of IFT in the newspaper] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover under public sector shall be greater than Tk. 111300000.00 BDT ( Eleven Crore Thirteen Lakh Taka Only) over the best three (3) years in the last five (5) financial years. |
The required average annual construction turnover under public sector shall be greater than Tk. 11,00,00,000.00 (Eleven Crore only) over the best three (3) years in the last five (5) financial years. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 21200000.00 BDT (Two Crore Twelve Lakh Taka Only) |
The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 1,85,00,000.00 BDT (One Crore Eighty-Five Lakh Only). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum capacity shall be Tk. 55600000.00 BDT (Five Crore Fifty-Six Lakh Taka Only) |
The minimum capacity shall be Tk. 5,50,00,000.00 (Five Crore Fifty Lakh Only).
The following formulae shall be used to calculate the Tender Capacity |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
[qualification of an alternative Construction Project Manager may also be requested] [for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) named N/A |
The Nominated Subcontractor(s) named None. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
Alternatives will not be permitted. |
Alternatives will not be permitted. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The prices quoted by the Tenderers shall be fixed for the duration of the Contract.
[Price adjustment clauses are usually permitted for Contracts, execution of which will take more than eighteen (18) months from Start Date to Completion Date. The Procuring Entity must consider each Contract on its individual merit; approval of HOPE will be required for Contracts of less than eighteen (18) months . If prices shall be adjustable, the base value of the Indexes including sources and, its corresponding weightings or coefficients for adjustment should be specified in the Appendix to Tender: Table 1.1 and 1.2 and in the Contract] |
The prices quoted by the Tenderers shall be fixed for the duration of the Contract. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | TThe required information regarding claims under litigation shall be current or during the last 5.00 years |
The required information regarding claims under litigation shall be during the last 3 (three) years. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
The required audit reports on the financial standing, such as profit and loss statements and balance |
The required audit reports on the financial standing, such as profit and loss statements and balance sheet shall be for the past 02 (two) years. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The Tender Validity period shall be 120 days.
[normally 60 to 150 days; shorter or longer period may be authorised by HOPE or Authorized officer to suit the requirements of particular Procurement activity]. |
The Tender Validity period shall be 120 days.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
The amount of the Tender Security shall be Tk. 1850000.00 BDT
|
The amount of the Tender Security shall be Tk. 18,50,000.00 BDT |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--E. Tender Submission-- |
For Tender submission purposes only, the Procuring Entity’s address is: The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. |
For Tender submission purposes only, the Procuring Entity’s address is: The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | The successful Tenderer shall furnish the Performance Security for the due performance of the Contract within 10 working days of issuance of the Notification of Award (NoA).
[• Within seven (7) working days, where the estimated cost does not exceed BDT 50 million (Taka five crore); • Within ten (10) working days, where the estimated cost exceeds BDT 50 million (Taka five crore) but does not exceed BDT 250 million (Taka twenty-five crore);
• Within fourteen (14) working days, where the estimated cost exceeds BDT 250 million (Taka twenty-five crore).] |
The successful Tenderer shall furnish the Performance Security for the due performance of the Contract within 10 working days of issuance of the Notification of Award (NoA).
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | The successful Tenderer shall sign the contract with the Procuring Entity within 21 days of issuance of the Notification of Award (NoA).
[• Within fourteen (14) days, where the estimated cost does not exceed BDT 50 million (Taka five crore); • Within twenty-one (21) days, where the estimated cost exceeds BDT 50 million (Taka five crore) but does not exceed BDT 250 million (Taka twenty-five crore); • Within twenty-eight (28) days, where the estimated cost exceeds BDT 250 million (Taka twenty-five crore).] |
The successful Tenderer shall sign the contract with the Procuring Entity within 21 days of issuance of the Notification of Award (NoA).
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | The biographical data of the Adjudicator is:
|
The biographical data of the Adjudicator is:
The hourly fee shall be TK 5000(Five Thousand only). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | DB-01 River Bank protection work (Precautionary) from km 14.500 to km 14.800 = 300 m at Debraj of Doiboggohati Sub-Project along the Left Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of Panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " under Bagerhat WD Division, BWDB, Bagerhat. |
DB-01 River Bank protection work (Precautionary) from km 14.500 to km 14.800 = 300 m at Debraj of Doiboggohati Sub-Project along the Left Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of Panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " under Bagerhat WD Division, BWDB, Bagerhat. |