The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be [03] years years counting backward from the date of publication of IFT in the newspaper. The minimum specific experience as a Prime Contractor in construction works under public sector of at least [01] contract(s) of minimum 10.0 kWp capacity on-Grid installation testing commissioning successfully completed within the last [05] years, each with a value of at least Tk. [5 Lac] in Power Grid/DESCO/DPDC/BPDB or or any other Government Electricity Company/Institution. Years counting backward from the date of publication of IFT in the newspaper. ABC Category Electrical Supervisory License from Bangladesh Electrical Licensing Board Others Criteria mentioned in Tender Documents
Supply, Installation, Testing and Commissioning of 15.0kWp Capacity On-Grid Solar System with Net Metering at Madunaghat 400/230kV Grid Substation under Grid Circle-Chattogram, Power Grid.