View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum issued as required. |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eligibility of Consultant |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Location(Lot No : 1) | Fashiatola | Fashiatola,Morrelganj,Bagerhat. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 1. Definitions(aa)Intended Completion Date | The Intended Completion Date for the whole of the Works shall be 2027-06-30 | The Intended Completion Date for the whole of the Works shall be 2027-06-30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 1. Definitions1.1(nn)Site |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 1. Definitions1.1(qq)StartDate | The Start Date shall be 2026-11-16 | The Start Date shall be 2026-12-02 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 1. Definitions1.1(uu)Works |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 13. Possession of the Site13.1 Possession of the Site |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 2. Interpretation2.5. Sectional completion |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 39. Commencement of Works39.1 Commencement of Works | Commencement Date of Works: 2026-11-01 | Commencement Date of Works:2026-11-25 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 41. Programme of Works41.2 Programme Update | The period between Programme updates is 15 | The period between Programme updates is 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 41. Programme of Works41.3 Withhold amount | The amount to be withheld for late submission of an updated Programme is 2000.000 | The amount to be withheld for late submission of an updated Programme is 20000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC 82. As-built Drawings and Manuals82.1 As-built drawing date |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Start Date(Lot No : 1) | 01/11/2026 | 25/11/2026 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- |
The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. The Name of the Tender is:River Bank protection work (Precautionary) along the Right Bank of the River at the Confluence of Panguchi-Baleshwar Rivers from km 2.025 to km 2.275 = 250 m at Fashiatola area of Polder no 35/1 in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of Panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " under Bagerhat WD Division, BWDB, Bagerhat. Tender Ref42.01.0100.617.44.001.24-581 Date: 23/09/2026: Lot No(s):FA-02 [if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities] |
The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. The Name of the Tender is: River Bank protection work (Precautionary) along the Right Bank of the River at the Confluence of Panguchi-Baleshwar Rivers from km 2.025 to km 2.275 = 250 m at Fashiatola area of Polder no 35/1 in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of Panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " under Bagerhat WD Division, BWDB, Bagerhat. Tender Ref No. 42.01.0100.617.44.001.24-592 Date: 24/09/2026 Lot No(s):FA-02 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- | The source of public funds is
|
The source of public funds is GoB.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- | For clarification of Tender Document purposes only, the Procuring Entity’s address is:
Attention:
[state date (within 2/3rds of time from the date of IFT)] |
For clarification of Tender Document purposes only, the Procuring Entity’s address is:
Attention: |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum specific experience as a Prime Contractor or Subcontractor or ManagementContractor in construction works under public sector of at least onecontract(s) ofConstruction/Repair of revetment/river bank protection work/shore protectionwork/crossbar/Spur/groyne successfully completed within the last 5 years, each with a value of at least Tk.54200000.00 BDT(Five Crore Forty-Two Lakh Taka Only); years counting backward from the date of publication of IFT in the newspaper |
The minimum specific experience as a Prime Contractor or Subcontractor or ManagementContractor in construction works under public sector of at least 01 (one) contract(s) of Construction/ Repair of revetment/ river bank protection work/ shore protection work/ crossbar/ Spur/ groyne successfully completed within the last 5 years, each with a value of at least Tk.5,40,00,000.00 (Five Crore Forty Lakh Only); years counting backward from the date of publication of IFT in the newspaper. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover under public sector shall be greater than Tk. 108500000.00BDT (Ten Crore Eighty-Five Lakh Taka Onlyover the best three (3) years in the last five (5) financial years. |
The required average annual construction turnover under public sector shall be greater than Tk. 10,50,00,000.00 (Ten Crore Fifty Lakh only) over the best three (3) years in the last five (5) financial years. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 20700000.00 BDT (Two Crore Seven Lakh Taka Only). |
The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 2,00,00,000.00 (Two Crore Only). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum capacity shall be Tk. Tk.54200000.00 BDT(Five Crore Forty-Two Lakh Taka Only). |
The minimum capacity shall be Tk. 5,40,00,000.00 (Five Crore Forty Lakh Only).
The following formulae shall be used to calculate the Tender Capacity |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
[qualification of an alternative Construction Project Manager may also be requested] [for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s)N/A. |
The Nominated Subcontractor(s) is None. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The required information regarding claims under litigation shall be current or during the last 5 years. |
The required information regarding claims under litigation shall be during the last 03 years. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
The required audit reports on the financial standing, such as profit and loss statements and balance |
The required audit reports on the financial standing, such as profit and loss statements and balance sheet shall be for the past 02 (two) years. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
The amount of the Tender Security shall be Tk. 1810000.00 in |
The amount of the Tender Security shall be Tk. 1810000.00 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--E. Tender Submission-- |
For Tender submission purposes only, the Procuring Entity’s address is: The PE is Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. |
For Tender submission purposes only, the Procuring Entity’s address is: Office of the Executive Engineer, Bagerhat WD Division, BWDB, Bagerhat. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | The biographical data of the Adjudicator is:
|
The biographical data of the Adjudicator is:
The hourly fee shall be Tk 5000 (Five Thousand only). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | FA-02 |
FA-02 |