View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum for TDS |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eligibility of Consultant | Eligibility of Tenderer: Any individual(s) firms who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) & other condition of the tender documents Special Instruction: 1. Payment shall be made subject to budget allocation & availability of fund but the work must be continued and proportionate progress must be achieved |
Eligibility of Tenderer: Any individual(s) firms who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) & other condition of the tender documents Special Instruction:
1. Payment shall be made subject to budget allocation & availability of fund but the work must be continued and proportionate progress must be achieved |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [state number] years.
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years. [Determination of general experience shall be subject to factors like market situation, complexity, value and nature of procurement. For example, it may be three (3) years for common type of procurement; years counting backward from the date of publication of IFT in the newspaper.] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [state number] contract(s) of [state the nature, complexity and methods/construction technology] successfully completed within the last [state number] years, each with a value of at least Tk. [state amount].
[The minimum ‘number’, ‘years’ and ‘value’ stated above will depend upon the market situation, complexity, value and nature of procurement., size and type of construction work. The Procuring Entity should make its own judgement based upon its experience in the sector and construction industry. For example, it could be one (1) contract of similar nature having contract value between 50% and 80% of the official estimated cost of the current tender, during the last three (3) years or five (5) years or ten (10) years or twenty(20) years considering any specific procurement requirements (whichever appropriate but it shall be mutually exclusive from the requirement of ITT 13.1(a)); years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package] |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least least 1 (one) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5(five) years, each with a value of at least Tk. 1100.00 Lakh (Eleven Crore) only. years counting backward from the date of publication of IFT on the e-Gp Web portal. For contracts under which the tenderer participated as a joint venture memeber or Subcontractor, only the tenderer share, by value, shall be considered to meet this requirements. Completion shall be based on the completion certificate of the completed works. Specific/Similar work means Construction/Repair of revetment/river bank protection work/shore protection work/crossbar/spur/groyne. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years or best [state number] years in the last [state number] years. [ the required average annual construction turnover is recommended to be equal to the estimated annual cash flow for the proposed Contract; however, the multiplier may vary from 1.0 to 1.5 the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (whichever appropriate in consistent with the requirement of ITT 14.1(a)); years counting backward from the date of publication of IFT in the newspaper] Example:
Estimated Contract Value: Tk 24 Cr. [for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
[The formula for setting the AACT is as follows: |
The required average annual construction turnover shall be greater than Tk [insert amount] over the last Tk 750.00 Lakh (Seven Crore Fifty Lakh) over the last 5 (Five) years. [ the required average annual construction turnover is recommended to be equal to the estimated annual cash flow for the proposed Contract; however, the multiplier may vary from 1.0 to 1.5 the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (whichever appropriate in consistent with the requirement of ITT 14.1(a)); years counting backward from the date of publication of IFT in the newspaper] Example:
Estimated Contract Value: Tk 24 Cr. [for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
[The formula for setting the AACT is as follows: |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum capacity shall be: [70%-80% of the official estimated cost] The following formulae shall be used to calculate the Tender Capacity Assessed Tender Capacity = (A*N*1.25-B)
Where
A=Maximum value of Works performed in any one year during last five years N= Completion time of the proposed work in years B= Value of Existing commitments and works to be completed during the next N Years
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package.
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
The minimum capacity shall be: 1450.00 Lakh (Fourteen Crore Fifty Lakh). The following formulae shall be used to calculate the Tender Capacity Assessed Tender Capacity = (A*N*1.25-B)
Where
A=Maximum value of Works performed in any one year during last five years N= Completion time of the proposed work in years B= Value of Existing commitments and works to be completed during the next N Years
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package.
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk [state amount] [usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after considering the financial requirements of existing commitments. The actual period will depend on the speed with which the Procuring Entity will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one-month contingency for preparing the cheque a making actual payment. Example:
Contract Value: Tk 24 Cr. Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] [for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
|
The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 180.00 Lakh (One Crore Eighty Five Lakh). [usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after considering the financial requirements of existing commitments. The actual period will depend on the speed with which the Procuring Entity will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one-month contingency for preparing the cheque a making actual payment. Example:
Contract Value: Tk 24 Cr. Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] [for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
[qualification of an alternative Construction Project Manager may also be requested] [for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience supported by CVs following the Form PW3-5.
[qualification of an alternative Construction Project Manager may also be requested] [for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
Tenderers shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The value of non-judicial stamp for execution of the Joint Venture Agreement shall be Tk 300 only |
The value of non-judicial stamp for execution of the Joint Venture Agreement shall be Tk 300 only |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Maximum number of partners in the JV shall be [insert number or insert “not limited”]
The minimum qualification requirements of Leading Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
[it is suggested that the Procuring Entity adheres to the above proportion of minimum qualifying requirements to meet the specific procurement needs. Percent share of business of the JV partners shall not be considered in determining the qualifications of a JV] |
Maximum number of partners in the JV shall be [insert number or insert “not limited”]
The minimum qualification requirements of Leading Partner, other Partner(s) and requirements by summation of a JV shall be as follows:
[it is suggested that the Procuring Entity adheres to the above proportion of minimum qualifying requirements to meet the specific procurement needs. Percent share of business of the JV partners shall not be considered in determining the qualifications of a JV] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works:
[state the components of the proposed works; if not applicable state ‘none’] |
The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: ‘none’ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | Bank Protection work along the Right bank of Katakhali River Working Length 550 m in connection with "Karotoa River System Improvement Project" under Gaibandha WD Division, BWDB, Gaibandha. (BPWKK-BOG/W-78) |
Bank Protection work along the Right bank of Katakhali River Working Length 550 m in connection with "Karotoa River System Improvement Project" under Gaibandha WD Division, BWDB, Gaibandha. (BPWKK-BOG/W-78) |