1. A Satisfactory Completion of work involving the installation of an on-grid / off-grid / hybrid solar power system or the installation of electrical equipment at a minimum 33 kV substation level in any government or state-owned organizations as a Prime Contractor with a value of minimum Tk Five (5.00) lacs under maximum one (1) contract within the last 03(Three) years shall be required. [years counting backward from the date of publication of IFT in the newspaper]
2. As stated in TDS/PCC.
Supply, Installation, Testing & Commissioning of On-Grid 30 kW Solar System (10KW each) at Rangpur, Saidpur & Mithapukur 132/33 Kv Grid Substation under GMD-Rangpur, Power Grid.