Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Correction of Notice, BOQ and TDS |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | The tender submitted by the Tenderer shall be treated as 'Non-Responsive' due to the failure to submit any of the following mandatory eligibility and qualification documents: 1. Specific Experience: Lack of required specific or similar nature of experience as stipulated in the Tender Data Sheet (TDS). 2. Average Annual Construction Turnover (AACT): Failure to submit acceptable AACT documentation in the form of official payment certificates. 3. Financial Resources & Requirements: Non-compliance with the minimum financial requirements specified in the TDS: 4. For Liquid Assets or Credit Lines: Failure to submit a formal sanction letter/credit commitment from a scheduled bank. 5. For Working Capital: Failure to submit audited financial reports. 6. Tender Capacity: Failure to submit information regarding 'Tender Capacity' strictly in accordance with the standard format provided in the Particular Conditions of Contract (PCC). Authenticity of Documents: Submission of any forged, fake, or false document will render the tender summarily 'Non-Responsive', and strict penal action will be taken against the concerned tenderer in accordance with the Public Procurement Act (PPA), 2006 and Public Procurement Rules (PPR), 2005 (including latest amendments). |
The tender submitted by the Tenderer shall be treated as 'Non-Responsive' due to the failure to submit any of the following mandatory eligibility and qualification documents: 1. Specific Experience: Lack of required specific or similar nature of experience as stipulated in the Tender Data Sheet (TDS). 2. Average Annual Construction Turnover (AACT): Failure to submit acceptable AACT documentation in the form of official payment certificates. 3. Financial Resources & Requirements: Non-compliance with the minimum financial requirements specified in the TDS: 4. For Liquid Assets or Credit Lines: Failure to submit a formal sanction letter/credit commitment from a scheduled bank. 5. For Working Capital: Failure to submit audited financial reports. 6. Tender Capacity: Failure to submit information regarding 'Tender Capacity' strictly in accordance with the standard format provided in the Particular Conditions of Contract (PCC). Authenticity of Documents: Submission of any forged, fake, or false document will render the tender summarily 'Non-Responsive', and strict penal action will be taken against the concerned tenderer in accordance with the Public Procurement Act (PPA), 2006 and Public Procurement Rules (PPR), 2025 (including latest amendments). |
| TDS/PDS--A. General-- | Tenderers shall have the following up to date valid License: None |
Tenderers shall have the following up to date valid License: Trade Licence, VAT and TAX |
| TDS/PDS--C. Qualification Criteria-- | The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least one contract(s) of [state the nature, complexity and methods/construction technology] successfully completed within the last 05 years, each with a value of at least Tk. 100 Lac. |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least one contract(s) of Shallow Tubewell, Tara Tubewell, Tubewell with Submersible Pump, Deep Tubewell, Community based Tubewell, Production Tubewell at multiple places successfully completed within the last 05 years, each with a value of at least Tk. 90 Lac. |
| TDS/PDS--D. Tender Preparation-- | Tenderers shall submit with its Tender the following additional documents: N/A |
Tenderers shall submit with its Tender the following additional documents: Work Plan |
| Brief Description of Goods,Works or Service | PSWSC-3243/1 Installation of 269 Nos. No. 06 Shallow Tube well and 278 Nos. Shallow Tara system tube well with 6 no hand pump (Non Extractable) at different places of Rangpur under the Project of Safe Water Supply Through Out The Country (PSWSC) during FY-2026-27 |
PSWSC-3243/1 Installation of 269 Nos. No. 06 Shallow Tube well and 278 Nos. Shallow Tara system tube well with 6 no hand pump (Non Extractable) at different places of Rangpur under the Project of Safe Water Supply Through Out The Country (PSWSC) during FY-2026-27 |