As per TDS
SDRIDP/SHAM/VR-86 Part-A: Improvement of Both side of Arpangasia Khal-Durgabati Cyclone shelter road by BC from Ch: 00-1500m (ID-287864093) under Shyamnagar Upazila, Dist: Satkhira. (Effective Length = 1500m) Part-B: Improvement of Arpangasia Growth Center- Madiyar Khalar Gora via Durgabati road by BC from Ch: 00-1460m (ID-287864185) under Shyamnagar Upazila, Dist: Satkhira. (Effective Length = 1460m) (Total Effective Length = 2960m) Salvaged Materials Cost BDT. 22,64,089.00