As per TDS
SDRIDP/SHAM/VR-90 Part-A: Improvement of Rudrapur-Dhapuarchalk road by BC from Ch: 00-1000m (ID-287865119) under Shyamnagar Upazila, Dist: Satkhira. (Effective Length = 1000m) Part-B: Improvement of Rudropur Kader Gazi Mosque- Rudropur Teghoria Hafizia Madrasha road by BC from Ch:00-1075m (ID-287865159) under Shyamnagar Upazila, Dist: Satkhira. (Effective Length = 1075m) (Total Effective Length = 2075m) Salvaged Materials Cost BDT. 10,48,496.00