As per TDS and PCC
PSWSC-3800 Installation of 10 Nos. of Deep Tube well (100*38)mm (520 m) with Submersible Pump, 10 Nos. of Deep Tube well (100*38)mm (365 m) with Submersible Pump, 9 Nos. of Deep Tube well (100*38)mm (280 m) with Submersible Pump and 19 Nos. of Deep Tube well 38mm (275 m) with No. 6 Hand Pump at Digholia Upazila, Installation of 32 Nos. of Deep Tube well (100*38)mm (280 m) with Submersible Pump and 8 nos. of Rain Water Harvesting System at Rupsha Upazila, Installation of 72 nos. of Rain Water Harvesting System at Dacope Upazila, Installation of 80 nos. of Rain Water Harvesting System at Paikgacha Upazila, Installation of 10 Nos. of Deep Tube well (100*38)mm (475 m) with Submersible Pump and 46 Nos. of Deep Tube well (100*38)mm (290 m) with Submersible Pump at Botiaghata Upazila and Installation of 37 Nos. of Deep Tube well (100*38)mm (230 m) with Submersible Pump and 19 nos. of Rain Water Harvesting System at Koyra Upazilla, Khulna under Project for Safe Water Supply Throughout The Country of Department of Public Health Engineering during 2026-2027 Fiscal Year.