| Field Name |
Old Value |
New Value |
|
|
|
|
| PCC 1. Definitions(aa)Intended Completion Date
|
The Intended Completion Date for the whole of the Works shall be 2027-06-30 |
The Intended Completion Date for the whole of the Works shall be 2027-06-30 |
| PCC 1. Definitions1.1(nn)Site
|
| Site location | Drawings Nos | | Architect Building | NA | |
| Site location | Drawings Nos | | Architect Building | NA | |
| PCC 1. Definitions1.1(qq)StartDate
|
The Start Date shall be 2026-11-27 |
The Start Date shall be 2026-11-27 |
| PCC 20. Subcontractor20.4 Nominated Subcontractor
|
| Nominated Subcontractor''s Name | Nominated Subcontractor entitled to execute the following specific components | | | |
| Nominated Subcontractor''s Name | Nominated Subcontractor entitled to execute the following specific components | | NA | NA | |
| PCC 38. Commencement of Works38.1 Commencement of Works
|
Commencement Date of Works: 2026-11-12 |
Commencement Date of Works:2026-11-12 |
| PCC 40. Programme of Works40.1 Programme Submission
|
The Contractor shall submit a Programme for the Works within 15 days of signing the Contract. |
The Contractor shall submit a Programme for the Works within 15 days of signing the Contract. |
| PCC 40. Programme of Works40.2 Programme Update
|
The period between Programme updates is 7 |
The period between Programme updates is 7 |
| PCC 40. Programme of Works40.3 Withhold amount
|
The amount to be withheld for late submission of an updated Programme is 5000.000 |
The amount to be withheld for late submission of an updated Programme is 5000.000 |
| PCC 55. Correction of Defects55.1 Defect Liability Period
|
The Defects Liability Period is 12 months |
The Defects Liability Period is 12 months |
| PCC 6. Documents Forming the Contract and Priority of Documents6.1 (k)Documents
|
| Other documents forming part of the Contract |
|---|
| None | |
| Other documents forming part of the Contract |
|---|
| None | |
| PCC 62. Payment Certificates62.4 ES obligations withheld Amount Percentage
|
The amount of payment withheld of forfeited amount due to failure in compliance with any obligations under ES Specifications or reporting arrangement shall be ~ |
The amount of payment withheld of forfeited amount due to failure in compliance with any obligations under ES Specifications or reporting arrangement shall be ~ |
| PCC 62. Payment Certificates62.5 ES obligations withheld maximum Amount Percentage
|
The maximum amount of payment withheld of forfeited due to failure in compliance with ES Specifications is 2.000 percent of the final Contract Price of the whole of the Works. |
The maximum amount of payment withheld of forfeited due to failure in compliance with ES Specifications is 2.000 percent of the final Contract Price of the whole of the Works. |
| PCC 64. Delayed Payment64.1 Rate of interest
|
The rate of interest shall be:0.000 percent |
The rate of interest shall be:0.000 percent |
| PCC 65. Compensation Events65.1 (k) Compensation Events
|
|
|
| PCC 68. Liquidated Damages68.1 Liquidated Damages
|
| Liquidated Damages for the uncompleted Works or any part per day of delay (%) | The maximum amount of Liquidated Damages (%) | | 0.001 | 1.000 | |
| Liquidated Damages for the uncompleted Works or any part per day of delay (%) | The maximum amount of Liquidated Damages (%) | | 0.001 | 1.000 | |
| PCC 87. Payment upon Termination87.1 Percentage for the works not completed
|
The percentage to apply to the contract value of the works not completed, representing the PE's additional cost for completing the uncompleted Works, is 15.000 percent. |
The percentage to apply to the contract value of the works not completed, representing the PE's additional cost for completing the uncompleted Works, is 15.000 percent. |
| PCC 9. Eligibility9.1 Contractor nationality
|
| Countries are not eligible |
|---|
| As per Govrment Policy | |
| Countries are not eligible |
|---|
| As per Govrment Policy | |
| PCC 9. Eligibility9.2 Origin Countries
|
| Country of origin are not eligible |
|---|
| None | |
| Country of origin are not eligible |
|---|
| None | |
| PCC 90. Settlement of Disputes90.2 (b) Adjudication
|
| Adjudicator Name | Adjudicator Address | Telephone No | Fax No | e-mail address | | Superintending Engineer | PWD EM circle-1, Dhaka | 02-223384750 | | | |
| Adjudicator Name | Adjudicator Address | Telephone No | Fax No | e-mail address | | Superintending Engineer | PWD EM circle-1, Dhaka | 02-223384750 | | | |
| PCC 90. Settlement of Disputes90.3 (b) Arbitration
|
The arbitration shall be conducted in the place mentioned below; [[[PWD EM circle-1, Dhaka]]] |
The arbitration shall be conducted in the place mentioned below; [[[PWD EM circle-1, Dhaka]]] |
| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
This Tender is open to all eligible tenderers as mentioned below :
(a) General experience: Reputed contractors/Bona fide firms who have a minimum of 05 (Five) years of general experience.
(b) Specific experience: Having experiences in successfully completing similar nature of works amounting minimum Taka 5.0 lac of Government/ Semi-Government in a single tender during the last 05 (Five)years
The above experiences/work certificate for successful completion of similar nature works shall have to be issued by:
(i) In case of the work done under any PWD Division, the certifying and authenticating authority shall be the concerned Executive Engineer.
(ii) In case of the work done under any Govt/Semi Govt/ Other than PWD the certifying authority shall be an officer not below the rank of Executive Engineer and the same duly verified by the concerned Executive Engineer of PWD of that district/area within whose jurisdiction work has been done.
(c) Average annual construction turnover during the last five years in Taka 3.70 lac.
(d)The minimum amount of Liquid Assets or Working Capital or Credit facilities of the Tenderer shall be Taka 3.30 lac. [Only Letter of Credit Commitment for Bank’s undertaking for Line of Credit (Form PW2a-8)] issued not earlier than twenty-eight (28) days before the day of the original deadline for submission of Tender is allowed]. Submission of a Tender Bank Solvency Certificate or Bank Statement Will not be entertained. (e) Updated Trade license, Income Tax clearance Certificate, and VAT Registration Certificate.
(f) Updated ABC-Category Electrical contractor and supervisory license from the Electrical Licensing Board, Government of Bangladesh. (h) The tenderer must submit a 'Spare Parts Supplier Certificate' of the existing lift brand on site from the manufacturer. (i) Installation experience of the existing lift brand is required.
|
This Tender is open to all eligible tenderers as mentioned below :
(a) General experience: Reputed contractors/Bona fide firms who have a minimum of 05 (Five) years of general experience.
(b) Specific experience: Having experiences in successfully completing similar nature of works amounting minimum Taka 5.0 lac of Government/ Semi-Government in a single tender during the last 05 (Five)years
The above experiences/work certificate for successful completion of similar nature works shall have to be issued by:
(i) In case of the work done under any PWD Division, the certifying and authenticating authority shall be the concerned Executive Engineer.
(ii) In case of the work done under any Govt/Semi Govt/ Other than PWD the certifying authority shall be an officer not below the rank of Executive Engineer and the same duly verified by the concerned Executive Engineer of PWD of that district/area within whose jurisdiction work has been done.
(c) Average annual construction turnover during the last five years in Taka 3.70 lac.
(d)The minimum amount of Liquid Assets or Working Capital or Credit facilities of the Tenderer shall be Taka 3.30 lac. [Only Letter of Credit Commitment for Bank’s undertaking for Line of Credit (Form PW2a-8)] issued not earlier than twenty-eight (28) days before the day of the original deadline for submission of Tender is allowed]. Submission of a Tender Bank Solvency Certificate or Bank Statement Will not be entertained. (e) Updated Trade license, Income Tax clearance Certificate, and VAT Registration Certificate.
(f) Updated ABC-Category Electrical contractor and supervisory license from the Electrical Licensing Board, Government of Bangladesh. (h) The tenderer must submit a 'Spare Parts Supplier Certificate' of the existing lift brand on site from the manufacturer. (i) Installation experience of the existing lift brand is required.
|
| Opening Date & Time
|
18/10/2026 15:00 |
22/10/2026 15:00 |
| Closing Date & Time
|
18/10/2026 15:00 |
22/10/2026 15:00 |
| Brief Description of Goods,Works or Service
|
Annual Operation and Maintenance of 02 (Two) Lifts, Each having a Capacity of 800 Kg and 07 Stops, in the Architect Building (FY 2026-2027).
|
Annual Operation and Maintenance of 02 (Two) Lifts, Each having a Capacity of 800 Kg and 07 Stops, in the Architect Building (FY 2026-2027).
|