View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | TDS correction |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 years.(Years counting backward from the date of publication of IFT in the newspaper.) 2. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 contract of similar nature successfully completed within the last 05 (Five) years, with a value of at least Tk. 450.00 (Four Hundred and Fifty) Lac only.(Years counting backward from the date of publication of IFT in the newspaper.) 3. The minimum amount of financial resources as liquid asset or credit line(s) or specific credit commitment of the Tenderers shall be Tk. 400.00 (Four Hundred) Lac only. Document of Liquid Assets to be submitted along with the tender must be issued in between publication date and submission date of the tender. Certificate of unconditional Liquid Asset must be submitted in prescribed form i.e. in e-PW3-8 form published by BPPA. 4. The required average annual construction turnover shall be greater than Tk. 850.00 (Eight hundred and Fifty) Lac over the last 5 years. For Turnover calculation, Financial Year wise payment Certificate from Concern PE is required.(Years counting backward from the date of publication of IFT in the newspaper.) 5. The minimum tender capacity not less than TK. 475.00 (Four Hundred and seventy five) lac only. |
1. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 years.(Years counting backward from the date of publication of IFT in the newspaper.) 2. The minimum specific experience as contracter in supply of CHILLER system in a single contract successfully completed within the last 3 (Three) years value of at least Tk. 4.50 crore.(Four crore Fifty Lacs) in Gov/Semi Gov/Autonomous Body of Bangladesh. 3. The minimum amount of financial resources as liquid asset or credit line(s) or specific credit commitment of the Tenderers shall be Tk. 400.00 (Four Hundred) Lac only. Document of Liquid Assets to be submitted along with the tender must be issued in between publication date and submission date of the tender. Certificate of unconditional Liquid Asset must be submitted in prescribed form i.e. in e-PW3-8 form published by BPPA. 4. The required average annual construction turnover shall be greater than Tk. 850.00 (Eight hundred and Fifty) Lac over the last 5 years. For Turnover calculation, Financial Year wise payment Certificate from Concern PE is required.(Years counting backward from the date of publication of IFT in the newspaper.)
5. The minimum tender capacity not less than TK. 475.00 (Four Hundred and seventy five) lac only. |
| TDS/PDS--C. Qualification Criteria-- | The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 contract of similar nature successfully completed within the last 05 (Five) years, with a value of at least Tk. 450.00 (Four Hundred and Fifty) Lac only.(Years counting backward from the date of publication of IFT in the newspaper.) |
The minimum specific experience as contracter in supply of CHILLER system in a single contract successfully completed within the last 3 (Three) years value of at least Tk. 4.50 crore.(Four crore Fifty Lacs) in Gov/Semi Gov/Autonomous Body of Bangladesh. |
| TDS/PDS--D. Tender Preparation-- |
Tenderers shall submit with its Tender the following additional documents: |
Tenderers shall submit with its Tender the following additional documents: |
| Brief Description of Goods,Works or Service | Construction of New building to establish Burn and Surgery Unit at Faridpur Medical College Hospital Campus, Faridpur ( S.H: Supply and Installation of air conditioner system, Forced Ventilation system and Dehumidifiers. |
Construction of New building to establish Burn and Surgery Unit at Faridpur Medical College Hospital Campus, Faridpur ( S.H: Supply and Installation of air conditioner system, Forced Ventilation system and Dehumidifiers. |