View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to unavoidable situations |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | as per ITT and TDS |
as per ITT and TDS |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 3,00,00,000.00 (Three Crore only) over the last 5 (Five) financial years.
1. Payment Certificates for construction works will be considered for construction turnover. A summary sheet of last five years’ Turnover to be submitted as per form attached in Section 12 (PW3A-2.2 Turnover Information Form). For Turnover calculation, Financial Year wise payment Certificate from Concerned PE is required. 2. If a Tenderer submits a payment certificate which was completed by a JV: To calculate the required average annual construction turnover, the Tenderer’s business share of the JV of the previous work experience shall be considered. [For example, if a Tenderer named ‘A’ submits a payment certificate amounting to 10 crore BDT completed by a joint venture of ‘A’ & another Tenderer ‘B’ (A-B JV) and the business share of ‘A’ & ‘B’ in ‘A-B JV’ is 51% and 49% respectively, the calculation of the average annual construction turnover will be: Value of construction turnover:
Tenderer ‘A’ = (10*0.51) crore BDT = 5.1 crore BDT] 4. If the JV share is not duly stated in the relevant certificate, or the required supporting document is not furnished, the said certificate shall be deemed unacceptable and shall be excluded from the calculation of the tenderer’s qualifying. |
The required average annual construction turnover shall be greater than Tk 5,00,00,000.00 (Five Crore only) over the last 5 (Five) financial years.
1. Payment Certificates for construction works will be considered for construction turnover. A summary sheet of last five years’ Turnover to be submitted as per form attached in Section 12 (PW3A-2.2 Turnover Information Form). For Turnover calculation, Financial Year wise payment Certificate from Concerned PE is required. 2. If a Tenderer submits a payment certificate which was completed by a JV: To calculate the required average annual construction turnover, the Tenderer’s business share of the JV of the previous work experience shall be considered. [For example, if a Tenderer named ‘A’ submits a payment certificate amounting to 10 crore BDT completed by a joint venture of ‘A’ & another Tenderer ‘B’ (A-B JV) and the business share of ‘A’ & ‘B’ in ‘A-B JV’ is 51% and 49% respectively, the calculation of the average annual construction turnover will be: Value of construction turnover:
Tenderer ‘A’ = (10*0.51) crore BDT = 5.1 crore BDT] 4. If the JV share is not duly stated in the relevant certificate, or the required supporting document is not furnished, the said certificate shall be deemed unacceptable and shall be excluded from the calculation of the tenderer’s qualifying. |
| Brief Description of Goods,Works or Service | IRIDPNFL/NOA/BEG/VR-BDG/24-25/W-1740 |
IRIDPNFL/NOA/BEG/VR-BDG/24-25/W-1740 |