As Per TDS
Installation of an automatic fire suppression system in the control room and generator room of the Manu Barrage KPI infrastructure Manu Barrage in c/w Manu River Irrigation Project under Moulvibazar Mechanical W.D Division, BWDB, Moulvibazar during the year 2026-27.