Any Contractor as PPR-2025 & Relevent Laws
TLP-08/2026-27/Remaining Work
Re-sectioning of Embankment with Slope Protection (Length=1.500 km.) and Protection of adjacent River Bank (Length= 1.860 km.) within Ch. km 63.380 to km. 64.980 of Polder No. 56/57 and Construction of Drainage Structure (3-Vent) at Tazumuddin Upazila of Bhola District. (Remaining Work)