| Eligibility of Tenderer : |
-
All tenderers must be registered with CPTU via the e-GP portal.
-
Tenderers must satisfy all criteria in the TDS and must not be blacklisted/debarred by BWDB or any government entity. All requisite documents specified in the TDS must be submitted , failing which the tender will be summarily rejected.
-
Liquid asset certificate must strictly follow the format given in the tender document.
-
Tenderers must inspect the site at their own cost to evaluate actual field conditions and quote rates accordingly. After contract award, no claim or request for variation, extra-rate work or additional payment due to site conditions will be entertained under any circumstances.
-
Land arrangements for access, labor sheds, campsite, material stacking, or diversion must be managed solely by the contractor at their own cost; no claim or assistance will be provided by BWDB.
-
The quantity of work may increase, decrease, or be dropped entirely without any entitlement to claims or rate revisions.
-
The contractor must procure and maintain all required insurance policies in line with existing government rules, procurement regulations, and contract provisions before starting work.
-
All testing costs (soil, materials, concrete strength etc.) must be borne entirely by the contractor.
-
Notification of Award (NOA) will be issued after formal approval of the revised DPP.
-
In case of any conflict, omission, or ambiguity not covered in the TDS/PCC, t |
| Brief Description of Works : |
Construction of 3-vent (Vent Size-1.50m X 1.80m) Regulator at Vandargaon Khal in connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Kashiaish Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram. (Reg-07/Vandargaon/Patiya-FCDI/2026-27)
|
| Evaluation Type : |
Lot wise |
| Document Available : |
Package wise |
| Document Fees : |
Package wise |
| Tender/Proposal Document Price (In BDT)
: |
5000 |
| Mode of Payment : |
|
| Tender/Proposal Security Valid Up to : |
13-Feb-2027 |
| Tender/Proposal Valid Up to : |
16-Jan-2027 |
| Lot No. |
Identification of Lot |
Location |
Tender/Proposal security (Amount in BDT) |
Tentative Start Date |
Tentative Completion Date |
| Reg-07/Vandargaon/Patiya-FCDI/2026-27 |
Construction of 3-vent (Vent Size-1.50m X 1.80m) Regulator at Vandargaon Khal in connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Kashiaish Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram. |
Kashiaish Patiya,Chattogram |
3500000 |
30-Nov-2026 |
10-Jun-2027 |
Procuring Entity Details:
Amendment / Corrigendum Detail
|
Amendment / Corrigendum No. : 1
|
| Amendment / Corrigendum Text : |
Changes in TDS as per e-gp guideline. |
| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
-
All tenderers must be registered with CPTU via the e-GP portal.
-
Tenderers must satisfy all criteria in the TDS and must not be blacklisted/debarred by BWDB or any government entity. All requisite documents specified in the TDS must be submitted , failing which the tender will be summarily rejected.
-
Liquid asset certificate must strictly follow the format given in the tender document.
-
Tenderers must inspect the site at their own cost to evaluate actual field conditions and quote rates accordingly. After contract award, no claim or request for variation, extra-rate work or additional payment due to site conditions will be entertained under any circumstances.
-
Land arrangements for access, labor sheds, campsite, material stacking, or diversion must be managed solely by the contractor at their own cost; no claim or assistance will be provided by BWDB.
-
The quantity of work may increase, decrease, or be dropped entirely without any entitlement to claims or rate revisions.
-
The contractor must procure and maintain all required insurance policies in line with existing government rules, procurement regulations, and contract provisions before starting work.
-
All testing costs (soil, materials, concrete strength etc.) must be borne entirely by the contractor.
-
Notification of Award (NOA) will be issued after formal approval of the revised DPP.
-
In case of any conflict, omission, or ambiguity not covered in the TDS/PCC, the provisions of PPR and relevant government rules shall govern.
|
|
-
All tenderers must be registered with CPTU via the e-GP portal.
-
Tenderers must satisfy all criteria in the TDS and must not be blacklisted/debarred by BWDB or any government entity. All requisite documents specified in the TDS must be submitted , failing which the tender will be summarily rejected.
-
Liquid asset certificate must strictly follow the format given in the tender document.
-
Tenderers must inspect the site at their own cost to evaluate actual field conditions and quote rates accordingly. After contract award, no claim or request for variation, extra-rate work or additional payment due to site conditions will be entertained under any circumstances.
-
Land arrangements for access, labor sheds, campsite, material stacking, or diversion must be managed solely by the contractor at their own cost; no claim or assistance will be provided by BWDB.
-
The quantity of work may increase, decrease, or be dropped entirely without any entitlement to claims or rate revisions.
-
The contractor must procure and maintain all required insurance policies in line with existing government rules, procurement regulations, and contract provisions before starting work.
-
All testing costs (soil, materials, concrete strength etc.) must be borne entirely by the contractor.
-
Notification of Award (NOA) will be issued after formal approval of the revised DPP.
-
In case of any conflict, omission, or ambiguity not covered in the TDS/PCC, the provisions of PPR and relevant government rules shall govern.
|
|
| TDS/PDS--C. Qualification Criteria--
|
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [One] contract(s) of [Construction/repair of regulator/ sluice/ weir/spillway/rubber dam/ syphon/aqueduct/barrage/combined water control structure/hydraulic elevator dam/ inlet/outlet] successfully completed within the last [5] years, each with a value of at least Tk. [1000 Lakh]. (years counting backward from the date of publication of IFT in the newspaper) |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [One] contract(s) of [Construction/repair of regulator/ sluice/ weir/spillway/rubber dam/ syphon/aqueduct/barrage/combined water control structure/hydraulic elevator dam/ inlet/outlet] successfully completed within the last [5] years, each with a value of at least Tk. [750 Lakh] (Seven Hundred Fifty).
|
| Brief Description of Goods,Works or Service
|
Construction of 3-vent (Vent Size-1.50m X 1.80m) Regulator at Vandargaon Khal in connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Kashiaish Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram. (Reg-07/Vandargaon/Patiya-FCDI/2026-27)
|
Construction of 3-vent (Vent Size-1.50m X 1.80m) Regulator at Vandargaon Khal in connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Kashiaish Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram. (Reg-07/Vandargaon/Patiya-FCDI/2026-27)
|
|