As Per TDS
SDRIDP/SADA/VR-96 Part-A: Improvement of Gangnia Bridge RHD-Srirampur Bazar via Gangati Para road by BC from Ch:00-1500m under Sadar Upazila, Dist: Satkhira. (Road ID-287824076) (Effective Length=1500m) Part-B: Improvement of Gangia FRB rd-Varukhali Hat road by BC from Ch:00-1486m under Sadar Upazila, Dist: Satkhira. (Road ID-287825009) (Effective Length=1486m) Part-C: Improvement of Bhomra bazar-WAPDA via Lakkhidari road by BC from Ch:1087-2142m under Sadar Upazila, Dist: Satkhira. (Road ID-287825065) (Effective Length=1055m) (Total Effective Length= 4041m) Slavaged Materials Cost BDT. 59,35,897.00