| Brief Description of Works : |
CIDP/Barura/2026-27/W-39 Part-A:Improvement of Noapara-Karaiya Road at Ch: 00-675m(Road ID:419094008) ,(i) Earth Work (591.622cum),(ii) Road Work(675m),(iii)Construction of (1x1.50mx1.50m)1No Box Culvert at Ch583m on the same road,(iv)Construction of 144m Protective Work on the same road,(v)Road Safety Work(675m),(vi)Tree-Plantation and Vetiver Grass(270m),Part-B:Improvement of Narayanpur U.Para-Narayanpur Haripur GC Road Via Noapara Kindergarten Road at Ch:00-1000m(Road ID:419095346),(Salvage Cost Tk. ,33,297/-),(i) Earth Work(466.155cum),(ii) Road Work(1000m), (iii) Construction of (0.900mx0.900m) 2Nos RCC Cross Drain at Ch:160m & 404m on the same road,(iv) Construction of 131m Protective Work on the same road,(v)Road Safety Work(1000m),(vi)Tree-Plantation and Vetiver Grass(350m),Part-C:Improvement of Mohespur-Kalamuri Road at Ch:750-1185m (Road ID: 419095078),(Salvage Cost Tk.45,600/-),(i) Earth Work(358.442cum),(ii)Road Work(435m),(iii)Construction of (0.900mx0.900m) 2Nos Cross Drain at Ch:181m & 1072m on the same road, (iv) Construction of 33m Protective Work on the same road, (v) Road Safety Work (435m), (vi) Tree-Plantation and Vetiver Grass(220m), Part-D: Improvement of Surichu Jhakur Bari-Mohespur U.P. Road at Ch: 00-800m (Road ID: 419095076) , (i) Earth Work (660.568cum), (ii) Road Work (800m), (iii) Construction of (0.900mx0.900m) 2Nos Cross Drain at Ch: 204m & 319m on the same road, (iv) Construction of 114m Protective Work on the same road, (v) Road Safety Work (400m), (vi) Tree-Plantation and Vetiver Grass(400m) under Barura Upazila, District: Cumilla.
|