The minimum number of years of general experience of the Tenderer as Prime Contractor, Subcontractor, or Management Contractor in the construction or dredging works shall be 5 (Five) years. The minimum specific experience as a Prime Contractor in the dredging works of least 1 contract(s), successfully completed within the last 3 (Three) years, with a value of at least BDT. 3,000,000.00 (thirty lac) only The minimum amount of liquid assets, i.e., working capital or credit line(s), of the Tenderer shall be BDT 3,000,000.00 (thirty lac) only.
Procurement of Dredging Works for the Water Intake Area of Payra 1320 MW Thermal Power Plant (Retender)