The minimum specific experience as a Prime Contractor in construction works of at least one (1) number of similar contract completed during last 5 (five) years: (i) Similar nature of work means completion of multi-storied building with R.C. frame structure & Pile foundation work valued Tk. 2700.00 (Two Thousand Seven Hundred) lakh in a single Contract under Public fund. This is to be supported by work order/NOA and completion certificate. The Tenderer should have ABC Electrical License. In case of JVCA any of the partners should have the ABC Electric License. (ii) Private Works or works done by any Developer or Real Estate Company will not be considered.
(iii) All documents submitted should be sealed & signed by the tenderer.
(iv) The Procuring Entity or his authorized officer at his discretion reserves the right to visit the building of similar nature of works for verification, if required.
The required average annual Construction Turnover shall be minimum Tk. 4200.00 (Four Thousand Two Hundred) lakh over the last 05 (Five) years i,e years counting backward from the date of publication of IFT in the news paper. Average annual Construction Turnover i,e total certified payments received for contracts in progress or completed under public sector i,e Government, Semi-Government and Autonomous bodies shall only be considered. Private works shall not be taken into account. The minimum amount of liquid assets i.e. working capital or credit facilities of the Tenderer shall be Tk. 950.00 (Nine Hundred Fifty) Lakh. The liquid asset certificate issued before 10/01/2018 will not be considered for evaluation. Liquid asset certificate will be checked by the Procuring Entity.
Vertical extension of front Block of Hospital Building from 6-storied to 8-storied and Vertical extension of Rear Block of Hospital Building from 5-storied to 8-storied at Satkhira Medical College and Hospital Satkhira.