Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | TDS & PCC Some Correction |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PCC--A. General-- | The Site is located at [location] and is defined in drawings No: |
The Site is located at Upazila: Charghat, District:Rajshahi and is defined in drawings (Section 9) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- |
The PE is |
The PE is
Executive Engineer |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | Possession of the Site or part(s) of the Site, to the Contractor shall be given on the following date(s); |
Possession of the Site or part(s) of the Site, to the Contractor shall be given on the following date(s); |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | The Sectional Completion Dates are:
[state part of the works and the corresponding dates, if applicable] |
The Sectional Completion Dates are:
Not applicable] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | The minimum insurance cover shall be:
|
The minimum insurance cover shall be:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | Other documents forming part of the Contract are; N/A. |
Other documents forming part of the Contract are; |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- | The amount to be withheld for failing to produce â??as-builtâ?� drawings and/or operating and maintenance manuals by the date required is Tk [insert amount]
[usually a very nominal amount] |
The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk. maximum 0.01% (zero point zero one percent) of the final amount. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- | The date by which â??as-builtâ?� drawings are required is [insert date]
The date by which operating and maintenance manuals are required is [insert date] |
The date by which “as-built” drawings are required is 07 (seven) days before the issuance of completion certificate The date by which operating and maintenance manuals are required is : Not Applicable |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--F. Termination and Settlement of Disputes-- | The percentage to apply to the contract value of the works not completed, representing the PEâ??s additional cost for completing the uncompleted Works, is 10 percent. |
The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 20% (Twenty percent) [When additional performance security is applicable due to the tender is significantly below the official estimated cost or unbalanced as a result of front loading 20% will be replaced by “Additional performance security plus 20%”] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--G. Claims, Disputes and Arbitration-- |
The Adjudicator jointly appointed by the parties is:
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Project Managers, Bangladesh. |
The Adjudicator proposed by the Procuring Entity is Mr. M. Azizul Hoque, Retd. Superintending Engineer, LGED. The hourly fee shall be Tk.1,000.00 (One Thousand only). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be last 05 (five) years.
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (one) contract of similar nature, complexity and methods/construction technology successfully completed within the last 05 (five) years, each with a value of at least Tk. 400.00 (four hundred ) Lakh. |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractorshall be 03 (Three years). Years counting backward from the date of publication of IFT in the e-GP web portal.
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 01 (One)successfully completion contract of minimum 70m Pre-Stress Concrete Girder Bridge within the last 5 (Five) years, with a value of at least Tk.4,00,00,000.00 (Four Crore Only).Years counting backward from the date of publication of IFT in the e-GP web portal. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 500.00 (five hundred) Lakh over the last 05 (five) years.
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 120.00 (one hundred Twenty ) Lakh. PPA-2006, PPR-2008 and PPR (Amendment)-2016 shall be the part and parcel of the contract. In case of quoted rate above/less 10% of the Official Estimated cost, |
The required average annual construction turnover i.e. total certified payments received for contracts in progress or completed under public sector from respective procuring entity shall be greater than Tk.5,00,00,000.00 (Five Crore only) over the last 05 (five)years, (years counting backward from the date of publication of IFT in the e-GP web portal)
The minimum amount of liquid assets or working capital or credit facilities of the Tender shall beTk.1,20,00,000.00 (One Crore Twenty Lakh only) PPA-2006, PPR-2008 and PPR (Amendment)-2016 shall be the part and parcel of the contract. In case of quoted rate above/less 10% of the Official Estimated cost, |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum Tender Capacity shall be: :[70%-80% of the official estimated cost]
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package] |
The minimum Tender Capacity shall be:Tk.4,00,00,000.00 ( Four Crore only). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300.00 |
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300.00 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows : |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk.300.00 : |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None. |
The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The Tenderer shall submit with its Tender the following additional documents: None. |
The Tenderer shall submit with its Tender the following additional documents: None. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
The prices quoted by the Tenderer shall be adjustable as follows: Modified. |
The prices quoted by the Tenderer shall be fixed for the duration of the Contract. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | The amount of Performance Security shall be 10 (ten) percent of the Contract Price. |