View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | The average annual construction turn over shall be greater than 1,59,05,000.00 instead of 7,95,23,925.00 |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 79523925 over the best 5 (five) years in the last 10 (ten) years. |
The required average annual construction turnover shall be greater than Tk 1,59,05,000.00 over the best 5 (five) years in the last 10 (ten) years. |