01. A satisfactory completion of similar works at least Tk. 18.00 Lac under single of contract(s) over a period of 05 years shall be required.
02.The required average annual construction turnover shall be greater than Tk. 29.00 Lac over the last 05 years. Turnover will be calculated on the basis of payment certificates only.
03.The minimum amount of liquid assets or working capital or credit facilities ofthe Tenderer shall be Tk. 17.00 Lac.
04. All Tenderers must have to satisfy the criteria as stated in the TDS. If the criteria is not satisfied, the tenderer will be non-responsive. If the quoted price varies by more than 10.00% above/less of the engineers estimate then the tender will be rejected.
05. Latest amendment of PPA-2006 and PPR-2008 shall be followed in tender evaluation.
06. As per Memo no-215, CE, RHD, Date 06-08-2017 the following criteria shall be followed for tender evaluation (a). As per consent of CPTU, the Tenderer shall be evaluated in the e-GP system with the help of online database system-TDMS. (b) Qualification information and evidences {such as work experience certificates, on-going works list, payment certificates for construction turnover, equipment list (own or rented), personnel list etc} of the Tenders as mapped in the e-GP Tenders must be available in the TDMS system so that TEC can evaluate the tenders digitally within short period of time. (c). If there is any conflicting information in TDMS and e-GP, the information provided in the e-GP system shall prevail.(d). A Tenderer having insufficient information in the TDMS system may be evaluated as ineligible (e) Evaluation sheet generated by TDMS shall be uploaded into the e-GP system by the TEC. Years will be counted backward from the date of publication of IFT in the website.
|