1. The minimum number of years of general experience of the Tenderer in the construction works shall be 05 (Five) years.
2. The minimum specific experience in installation works of at least 02 (Two) contracts of Installation, Testing and Commissioning of 33/11 kV, 20/28 MVA or Higher capacity Power Transformer and Associated equipments successfully completed within the last 05 (Five) years, each with a value of at least Tk.20,00,000.00
3. The required average annual construction turnover shall be greater than Tk 15,00,000.00 over the last 03 (Three) years.
4. The minimum amount of liquid assets i.e. working capital or credit line(s) of the Tenderer shall be Tk.15,00,000.00
Installation of 33/11 kV, 20/28 MVA Transformer at Shyampur Substation.