1.Only who are Registered on e-GP system from CPTU.
2. A satisfactory completion of similar works of at least Tk 9.00 (Nine Point zero zero) Lac under a single contract(s) over a period of last 03 (Three) years shall be required.
3.The required average annual construction turnover shall be greater than Tk 8.50 (Eight Point Five Zero) Lac over the last 05 (Five) years.
4. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 5.00(Five) Lakh.
Special Insrtuction for paying tender security: In the form of MICR Bank Draft/ Pay Order in favour of Accounts Officer, Regional Accounting Centre (RAC), BWDB, Rajshahi.
Construction of drainage out-let