Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Correction of TDS & PCC |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Document last selling date & time | 18/02/2018 17:00 | 25/02/2018 17:00 | ||||||||||||||||||||||||||||
| Opening Date & Time | 19/02/2018 15:00 | 26/02/2018 15:00 | ||||||||||||||||||||||||||||
| PCC--A. General-- | The Intended Completion Date for the whole of the Works shall be 365 days from the commencement date. |
The Intended Completion Date for the whole of the Works shall be 220 days from the commencement date. |
||||||||||||||||||||||||||||
| PCC--A. General-- | The minimum insurance cover shall be:
|
The minimum insurance cover shall be:
|
||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- | The amount to be withheld for failing to produce â??as-builtâ?� drawings and/or operating and maintenance manuals by the date required is Tk. maximum 0.01% (zero point zero one percent) of the final amount. |
The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk. maximum 0.01% (zero point zero one percent) of the final amount. |
||||||||||||||||||||||||||||
| PCC--F. Termination and Settlement of Disputes-- | The percentage to apply to the contract value of the works not completed, representing the PEâ??s additional cost for completing the uncompleted Works is15% percent. |
The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works is15% percent. |
||||||||||||||||||||||||||||
| Last date & time for Tender/Proposal Security Submission | 19/02/2018 14:00 | 26/02/2018 14:00 | ||||||||||||||||||||||||||||
| Closing Date & Time | 19/02/2018 15:00 | 26/02/2018 15:00 | ||||||||||||||||||||||||||||
| TDS/PDS--A. General-- |
The PE is The Executive Engineer
The Name of the Tender is: Construction of Upazila Muktijoddha Complex Bhaban at Komolnagar Upazila District Laxmipur. Tender Ref: CUMCP/LAX/KOM/17/C-351, APP ID-64986 Re-Tender ID no:159553 Lot No(s): 1 [if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities] |
The PE is The Executive Engineer
The Name of the Tender is: Construction of Upazila Muktijoddha Complex Bhaban at Komolnagar Upazila District Laxmipur. Tender Ref: CUMCP/LAX/KOM/17/C-351, APP ID-64986 Re-Tender ID no:159553 Lot No(s): 1 [if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities] |
||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [state number] years. [a minimum of three (3) years would be deemed reasonable; years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [state number] contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last [state number] years, each with a value of at least Tk. [state amount].
[the minimum number of contracts will depend upon the size and type of construction work, and the PE should make its own judgement based upon its experience in the sector and construction industry. For example, for large works, it could be one (1) contract of similar nature during the last three (3) years or five (5) years or ten (10) years (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package] |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years. (years counting backward from the date of publication of IFT in the e-GP web portal)
Satisfactory completion of similar work at least Tk 19000000.00 (One Hundred ninety) Lac under a single contract(s) over a period of last 05 (five) years shall be required.( years counting backward from the date of publication of IFT in the e-GP web portal) |
||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractorâ??s monthly certificate, allowing time to prepare an invoice, for the Project Managerâ??s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
a) The required average annual construction turnover shall be greater than Tk 25000000.00(Two Hundred Fifty) lac over the last 5 [Five] years.( years counting backward from the date of publication of IFT in the e-GP web portal) |
||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum Tender Capacity shall be: :[70%-80% of the official estimated cost]
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package] |
The minimum Tender capacity shall be Tk 19000000.00 (One Hundred ninety) lac
[The following formulae may be used to calculate the Tender Capacity |
||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
[The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows : |
[The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows : |
||||||||||||||||||||||||||||
| TDS/PDS--E. Tender e-Submission-- | The deadline for lodgement of e-Tenders is : 14 February, 2018 Time: 15.00pm |
The deadline for lodgement of e-Tenders is : 26 February, 2018 Time: 15.00pm |
||||||||||||||||||||||||||||
| Tender/Proposal Security (Amount in BDT)(Lot No : 1) | 735000.0 | 640000 |