(a) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 05 (Five) years. (b)A satisfactory completion of similar works of at least Tk 55,00,000.00 ( Fifty Five Lac Taka Only) Under summation of Maximum 1 (One) numbers of contracts over a period of last 5 (Five) years shall be required. (c) The required average annual construction turnover shall be greater than Tk 97,00,000.00 (Ninety Seven Lac Taka Only) over the last 5 (Five) years. (d) The minimum amount of liquid asset ie banking instrument or working capital or credit facilities or credit line of the Tenderer shall be Tk 21,00,000.00 (Twenty One Lac Taka Only).
Construction of class of SUVADDHA POSHCHIM PARA Government Primary school H3V2 under NBIDGPS project Keraniganj Dhaka