1.Only who are Registered on e-GP system from CPTU.
2. A satisfactory completion of similar nature of works shall be Tk. 13.00 lac under 01 (One) No. of contract over the last 03 (Three) years shall be required.
3. The required average annual construction turnover shall be Tk. 26.00 lac over the last 03 (Three) years.
4. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk.12.00 lac. In case of credit Certificate from the bank , specific pakage number & name of work must be shown in the certificate along with document of credit facilities.
Repair of Protective work along the both Bank of Mogra River in between km 3.80 to km 4.85=182.00M in C/W Netrakona Town Protection Project under Netrakona O&M division, BWDB, Netrakona during the year-2012-2013.