A satisfactory completion of similar works at least Tk 8.00 (Eight ) lakhs under Single of contract over a period of last 03(Three) years shall be required. Counting backward from the date of publication of IFT in the website. The required average annual construction turnover shall be greater than Tk 12.00(Twelve) lakhs over the last 03 (Three) years. Counting backward from the date of publication of IFT in the website. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 12.00(Twelve) lakhs.
Repair of pavement by aggregate base type-II & potholes with carpeting method & 7mm seal coat work at 2nd km of Dohar(Bastola)-Kartikpur-Jhawkanda-Moinut road (Z-8207) under Mujnshigonj Road Division during the year 2014-2015.(CH.1+000 to 2+000.)