As per TDS
MGSP/NCC/2017-18/W-15
Rehabilitation/Restoration of Baburail Canal (Site Preparation,Sludge removal, Protection works, Walk way & Seating, Road widening, Construction of RCC Viewing Deck, Construction of RCC Bridge, Construction of RCC Box Drain, Electrical & Lighting, Environmental management & Monitoring etc) Ch. 732-981m Under Narayanganj City Corporation. Part-A: Site Preparation works (demolation) ch.732-981m. Part-B: Sludge removal & reshaping of Canal ch. 732-981m. Part-C: Protection works (Slope & adjacent strucres) ch. 732-981m. Part-D: Walkway, Bicycle track, Seating etc ch. 732-981m. Part-E: Existing road widening ch. 732-981m under NCC Part-F : Construction of RCC Viewing Deck (2 nos) ch. 732-981m under NCC Part-G : Construction of RCC Bridge (18.00mx 7.00m) under NCC at ch.865m & Metal Bridge 16.00mx 3.60m at ch.930m. Part-H: Construction of RCC box drain ch. 732-981m. Part-I: Electrical & Lighting works ch. 732-981m. Part-J: Environmental Management & Monitoring Cost Ch. 732-981m.