As per TDS
MGSP/NCC/2017-18/W-17
Rehabilitation/Restoration of Baburail Canal (Site Preparation,Sludge removal, Protection works, Walk way & Seating, Construction of RCC Ghat, Road widening, Construction of RCC Bridge, Construction of RCC Box Drain & RCC Pipe drain, Electrical & Lighting, Environmental management & Monitoring etc) Ch. 1300-1535m Under Narayanganj City Corporation. Part-A: Site Preparation works (demolation) ch. 1300-1535m. Part-B: Sludge removal & reshaping of Canal ch. 1300-1535m Part-C: Protection works (Slope & adjacent strucres) ch. 1300-1535m Part-D: Walkway, Seating etc ch. 1300-1535m Part-E: Construction of RCC Ghat under NCC ch. 1300-1535m Part-F: Existing road widening ch. 1300-1535m under NCC Part-G : Construction of RCC Bridge (18.00mx 7.00m) under NCC at ch.1495m & Metal Bridge 16.00mx 3.60m at ch.1345m. Part-H: Construction of RCC box drain & RCC Pipe drain ch. 1300-1535m. Part-I: Electrical & Lighting works ch. 1300-1535m. Part-J: Environmental Management & Monitoring Cost Ch. 1300-1535m