AS per TDS
MGSP/NCC/2017-18/W-18
Rehabilitation/Restoration of Baburail Canal (Site Preparation, Sludge removal, Protection works, Walk way & Seating, Road widening, Construction of RCC Bridge, Construction of RCC Box Drain & RCC Pipe drain, Electrical & Lighting, Environmental management & Monitoring etc) Ch. 1535-1800m Under Narayanganj City Corporation. Part-A: Site Preparation works (demolation) ch. 1535-1800m Part-B: Sludge removal & reshaping of Canal ch. 1535-1800m Part-C: Protection works (Slope & adjacent strucres) ch. 1535-1800m Part-D: Walkway, Seating etc ch. 1535-1800m Part-E: Existing road widening ch. 1535-1800m under NCC Part-F : Construction of RCC Bridge (18.00mx 7.00m) under NCC at ch.1595m, 1746m & Metal Bridge 16.00mx 3.60m at ch.1630m, 1676m. Part-G: Construction of RCC box drain & RCC Pipe drain ch. 1535-1800m. Part-H: Electrical & Lighting works ch. 1535-1800m. Part-I: Environmental Management & Monitoring Cost Ch. 1535-1800m