AS per TDS
MGSP/NCC/2017-18/W-20
Rehabilitation/Restoration of Baburail Canal (Site Preparation, Sludge removal, Protection works, Walk way & Seating, Construction of Metal Bridge, Construction of RCC Box Drain & RCC Pipe drain, Electrical & Lighting, Environmental management & Monitoring etc) Ch. 2000-2340m Under Narayanganj City Corporation. Part-A: Site Preparation works (demolation) ch. 2000-2340m Part-B: Sludge removal & reshaping of Canal ch. 2000-2340m Part-C: Protection works (Slope & adjacent strucres) ch. 2000-2340m Part-D: Walkway, Seating etc ch. 2000-2340m Part-E : Construction of Metal Bridge (18.00mx 7.00m) under NCC at ch.2298m Part-F: Construction of RCC box drain & RCC Pipe drain ch. 2000-2340m Part-G: Electrical & Lighting works ch. 2000-2340m. Part-H: Environmental Management & Monitoring Cost Ch. 2000-2340m